Laserfiche WebLink
SWRCB,January 2002 Page b of <br /> 8. FILL RISERCONTAINMENT SUMP TESTING <br /> VNI111tser <br /> is Not ed With Fill Riser Containment Sums <br /> Containment Sumps are Present,but were Not Testedethod Developed.By: U Sump Manufacturer U Industry Staadsrd U Professimal En <br /> U Other(Speci,�Y) <br /> Test M Used: U Pressure U Vacuum U Hydrostatic <br /> U Ether(4pft y) <br /> Test Egaipanertt Equipme� hition.. <br /> Fill SawE# Fill Sum # F' # VMS # <br /> Diameter: <br /> Heigh from Tank Top to Top of <br /> 400 ftLaxPenetration: <br /> Height from.Tank Tcj)to Lowest <br /> Electrical Penetratidn: <br /> Conditipn of sump prior to <br /> testing: <br /> ortion dsunip Tested <br /> Material: . <br /> Wait tizwbitweea appl*8 <br /> Mmu-ehacuwWwaler and <br /> starft test <br /> Test Start Time: 000, <br /> Initial Readin <br /> Test End Time: <br /> Fin$+lteadin <br /> Test Duration: <br /> Cham in R ' <br /> Pass/Fail Threshold- Cyiteria: <br /> OMEN= mum mom= <br /> Is there a the ? LJ Yes U Na U'Yes. U NO U Yes U N U Yes U No <br /> Does the wnAr alarm when U Yes UNo U NA <br /> deter or water is U Yes UNo U NA U Yet UNo U NA Yes UNo U NA <br /> Was 76or removed for testing? U Yes U No U NA U Yes U No U NA U Yes UNo U NA U Yes . No U NA <br /> W senwPmP�Y replace <br /> IVI ed bactionai after testEag?d and U Yes U No U NA U Yes UNd U NA U Yes UNo U NA. U Yes UNo <br /> Comments—(include infarmatPon on re!airs made pripr to testing mid reeommended�oiiow-up far)Iaited rests) <br />