Laserfiche WebLink
SWRCB,January 2002 Page 3 of <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By: aping Manufacturer U Industry Standard U Professional Eugineer <br /> U then(Specjfy) <br /> Test Method Used: U Vacuum U Hy <br /> C=tba fY) <br /> Test Equipment Used:Pres$KY L G-rd N 6 ri S N l ✓p ✓\ Equipment R�uitiO12: 1 1 1'0 —l 5 P ST <br /> $hping Ran#L Piping Run# piping Run# Piping Run# <br /> Pip' Material: F1 <br /> Piping Manafacturer <br /> Piping Diameter: `1 <br /> Length of Piping Rug. ,rpt, 3,2 1 <br /> Product Stared: tu,4eA <br /> Method and location of -1- b o0+e,r <br /> isolatim: 5T P1 <br /> Wai tween applying <br /> ressure/v umhvater and <br /> s test: 11.a+d.✓ <br /> Test Start Time: <br /> Initial Reading(N: S P m <br /> Test End Time: 11`00 <br /> Final Reading(110. 5 P S_T_ <br /> Test Duration: t k v uY <br /> Change in Reading T Ra. I P s= <br /> Pas&Tail Threshold oT <br /> Criteria: N t?Loss t M <br /> COMMeRb- v�:J de No L n.on made rzw i0.kSdn m d r!commendad olimv- ar ailed tests <br /> _�GNl��2 �T��°-C.. 1�1,ct,S 4 �0. 2. a 6�,L.�--1y►°��}�„•w� <br />