Laserfiche WebLink
uui-1.5-4�00�> 11:213 CENTRAL PETROLEUM MAINT 9254628352 P.04 <br /> Monitoring System Certification <br /> F. In-Tank Gauging/ SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the foliowin checklist: <br /> lf3 Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> LA Yes JQ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes ❑ No" Was accuracy of system product level readings tested? <br /> Yes Q Not Was accuracy of system water level readings tested? <br /> Yes ❑ No" Were all probes reinstalled properly? <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): Q Check this box if LLDs are not installed. <br /> Com fete the folio win checklist: <br /> Yes Q No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> 13 N/A (Check all that apply) Simulated leak rate. 3 g.p.h.; Q 0.1 g.p.h; ❑0.2 g.p.h. <br /> Yes ❑ No` Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> 91 Yes L❑ Not Was the testing apparatus properly calibrated? <br /> Q Yes Q W For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> Q N/A <br /> ❑ Yes D No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A or disconnected? <br /> 13 yes ❑ Not For electronic LLDs,does the turbine automatically shut of if any portion of the monitoring system malfunctions <br /> N/A or fails a test? <br /> Q Yes C3 Not For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> Yes LO No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> D. Comments: <br /> UN-036-314 page 3 of 3 ttev.06/04/01 <br /> www.uptdacs.org <br />