Laserfiche WebLink
i <br /> SWRCB,January 2002 FINAL DRAFT Page_�L of 7 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method used: ❑Pressure ❑ vacuum Hydrostatic <br /> El other(specify) <br /> Test Equipment Used: Caldwell Sump Level Change Indicator EquipmentResolution: 0.0025" <br /> Sump# Sump# Sump# Sump# <br /> 879-G3U I 879D lU 1 <br /> Sump Diameter: 42" 19" <br /> Sump Depth from Top of Tank: 27.25" 27.00" <br /> Sump Material: FRP Coated Steel <br /> Height from Tank Top to Top of 12.25" 13.50" <br /> Highest Pim Penetration: <br /> Height from Tank Top to Top of 15.25" 22.00" <br /> Lowest Electrical Penetration: <br /> Condition of sump prior to to Clean/Dry Clean/Dry <br /> Depth of Sump Tested' 14.50" 18.75" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes[]No[]NA ❑Yes❑No NA ❑Yes❑No DNA ❑Yes❑ —INA <br /> NA <br /> product and water)?* <br /> Turbine shutdown response time: 10 seconds Safe Suction <br /> Is system programmed for fail-safe <br /> shutdown? yes❑No❑NA ❑Yes❑No ONA ❑Yes®No[INA ❑Yes❑No[]NA <br /> Was fail-safe verified to be Yes❑No❑NA ❑Yes❑No[DNA ❑Yes❑No[INA ❑'Yes❑No❑NA <br /> o rational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10 minutes 10 minutes <br /> test: <br /> Test Start Time: 8:45am 10:05am <br /> Initial Reading(Rj): 14.50?' 18.75" <br /> Test End Time: 9:35am 10:45am <br /> Final Reading(RF): 14.50" 18.75" <br /> Test tion: 50 minutes 40 minutes <br /> Change in Reading(RF-P11): 0.00" 0.00" <br /> Pass/Fad Threshold or Criteria: 0.005" 0.005" <br /> Test Result NPass ❑Fail OPass ❑Fail OPass OFail ❑P ❑Fail <br /> Was sensor removed for testing? ZYes[]No❑NA ZYes❑No ]NA _]Yes❑No❑NA ❑Yes❑No[INA <br /> Was sensor properly replaced and ®Yes[]No❑NA NYes❑No❑NA ❑Yes❑No DNA []Yes❑No❑NA <br /> verified functional after testing? <br /> Comments—(Include information on repairs made prior to testing,and recommended follow-up for failed tests. <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to M of the questions indicated with an <br /> asterisk(*)is"No",then the entire sump should be tested. (See SWRCB LG-160) <br />