Laserfiche WebLink
01/15/2009 14:59 FAX 925 422 2748 WGMG IA011/019 <br />Ll <br />Be sure to always READ THE DRAWINGS <br />sure that your mounting points are the same. Call Bravo <br />Systems If any problem occurs. <br />A2 - Position and bolt down conversion frame to the dispenser pan using the anchor plates of the <br />conversion frame with minimum 1/2" Diameter bolts. Use plastic caps to cover the bolts/nuts. <br />For Non -Bravo Sumps - A minimum of Four anchor bolts must be secured directly to concrete. <br />3 - Adjust electrical conduits to line up with the new dispenser if necessary. <br />A - Pre -plumb all product inlets and vapor recovery line with offsets and/or rigid pipe and elbows <br />if necessary. <br />Dispenser <br />Base %.- <br />Anchor <br />Plate - <br />Cocnrete Anchor <br />Bolts <br />T <br />BRAY® BOX <br />A <br />FOR OLD <br />DISPENSER <br />and is not a reference <br />for your layout within <br />�` <br />�r'•'6', „', <br />the hydraulic C0binet <br />:: ';.;�=�.�. <br />:•a , ;;;...�.�;. �� �<:' =rte`- <br />.:;r.�; <br />ii-ConversionFrame 3.25-08 <br />Cocnrete Anchor <br />Bolts <br />T <br />- <br />Equipment shown is for <br />illustration purposes only <br />and is not a reference <br />for your layout within <br />�` <br />�r'•'6', „', <br />the hydraulic C0binet <br />~, ��� •'i ':, �; :,7,, .fit, : •1rr� : � '" .y . <br />'J ••.~ .... ..'r:•) �.wM r. ,w•a,V �wi•lY�i,' r r ..'-.. �•a:•�•: <br />ii-ConversionFrame 3.25-08 <br />