My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 13
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2022 4:19:45 PM
Creation date
6/3/2020 9:55:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 13
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 13.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01/13/2009 14:59 FAX 925 422 2748 WGMG <br />Tools & Equipment Offsets, elbows, nipples, unions, Etc.. <br />Concrete Anchor Bolts * Plastic caps (sow plugs) for nuts / bolts <br />[a 013/019 <br />* S. Bravo Systems, Inc_ does not include Concrete Anchor Bolts with its Conversion Frames. <br />t <br />Ensure that you have all your permits in order, including your Bravo Certification Card. <br />Conversion Frame is free of damage? <br />Physically check the Dispenser, Sump and Conversion Frame drawings before installation? <br />�] NO modification to the Conv-Frame is necessary? If so, Call 323.888-4133 immediately. <br />® Dispenser was carefully removed and any spills contained? <br />® Drawings for all components are on-site and have been reviewed for any problems? <br />Conversion Frame is securely bolted to the existing UDC Sump with minimum 1/2" bolts? <br />If OPP or a Non -Bravo Systems UDC Is existing, were a minimum of 4 anchor bolts <br />securely installed directly to the concrete? <br />All electrical conduits are adjusted correctly to mate with the new dispenser? <br />® All product inlets are pre -plumbed with approved offsets, elbows, pipe, etc..? <br />® Conversion Frame was inspected for dents or damage? <br />Dispenser was carefully lined up and securely bolted to the Conversion Frame? <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.