Laserfiche WebLink
SWRCB. January 2002 0 FINAL DRAFT 0 <br />8. FILL RISER CONTAINMENT SUMP TESTING <br />Page 6 of 7 <br />�acifi�y­ssNt Equipped With Fill Riser Containment Surnp(s) <br />Fill Riser Containnient Sumps are Pi but were Not Tested <br />Test Method Developed By: Sunip Manufacturer El hidiandard E3Professional Engineer <br />Other (Specify) <br />Test Method Used: F1 Pressure R Vacuum El Hydrostatic <br />El Other (Specift, <br />Test Equipment Used: Equipment Resolution: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition 1*f_sump_pn_ii+r to <br />testing: <br />Portion of Sump Tested <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Final Reading (RF): <br />e on: <br />in Reading (RF-Rj): <br />Pass/Fail Threshold or <br />I Is there a sensor in the sum? <br />Yes __�Xo <br />MEn <br />r5m—s the sensor alann when <br />either product orwater is <br />ji detected? <br />El, No UNA=' <br />Yes ONo EINA <br />Elyes E]No [:INA <br />[:]Yes E]No [:INA <br />Was sensor removed for testing? <br />■Yes []No N NA <br />"1591MMIM, <br />No M.-INMEMsm <br />Fi [:]No UNA <br />isms 0 <br />18yMEMNSM <br />FlYes [:]No [INA <br />Comments — (Include information an repairs made prior to testing, and recon mended follow-up for failed tests.) <br />No fill riser containment sumps <br />