Laserfiche WebLink
AFFILIATE <br /> Thornton Environmental Construction Inc. PCI <br /> P.O. Box 360833 Milpitas, CA 95036-0833 <br /> Phone(408) 946-1015 •(209)834-0792 9 Fax (209) 834-0795 <br /> ANNUAL TEST RESULTS FOR THE PRODUCT AND VAPOR OVERFILL CONTAINMENT <br /> Name: Lawrence Livermore National Laboratory Date: 8-08-2012 <br /> Address: Site 300, Tracy, CA 95376 Bldg: 882 <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ©Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ©Hydrostatic <br /> ❑Other(Specify') <br /> Test Equipment Used: Visual went Resolution: 0.0625" <br /> Spill Boa# Spill Boz# Spill Box# Spill Box# <br /> 882-DlU1 <br /> Nominal Bucket Capacity in 7.5 Gallons <br /> gallons: <br /> Test fails if the bucket does Pass <br /> not hold at least 5 gallons <br /> Bucket Depth(inside 15" <br /> measurement): <br /> Wait time between filling with 5 minutes <br /> water and starting test: <br /> Test Start Time: 9:32a <br /> Initial Reading(R,): 14.50" <br /> Test End Time: 10:33a <br /> Final Reading(RF): 14.50" <br /> Test Duration: 61 minutes <br /> Change in Reading(RF-R): O.00GPH <br /> Pass/Fad Threshold/Criteria: O.I0GPH <br /> Test Result: I ©Pass E3Fail LlPass LlFail ❑Pass ❑Fail LlPass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Test water was disposed of by LLNL. <br /> Technician Name: Brian Thornton Signature: J� <br />