Laserfiche WebLink
Monitokng System Certification <br /> A Results of Testing/Servicing <br /> Software Version Installed: 5.03 <br /> Complete the follo ing checklist: <br /> Z Yes 0 No* Is the audible alarm operational? <br /> 0 Yes 0 No* Is the visual alarm operational? <br /> 0 Yes 0 No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> 0 Yes 0 No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment <br /> will not interfere with their proper operation? <br /> n Yes F1 No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) <br /> 0 N/A operational? <br /> 0 Yes 0 No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> E] N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply) 0 Sump/Trench Sensors; 0 Dispenser Containment Sensors. <br /> I Did you confirm positive shut-down due to leaks and sensor fail disconnection? 0 Yes, 0 No. <br /> 0 Yes 0 No* For Link systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br /> ® N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? % <br /> 0 Yes* ER No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment <br /> replaced and list the manufacturer name and model for all replacement parts in Section E,below. <br /> u Yes* 0 No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> 0 Product; 0 Water. If yes,describe causes in Section E,below. <br /> 0 Yes 0 No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> 1Z Yes 0 No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> The Diesel system is"Safe Suction".Both tanks have mechanical overfill drop tubes. <br /> System has a remote annunciator mounted on outside wall of building,facing the Links. Operation was verified. <br /> Page 2 of 3 <br />