Laserfiche WebLink
Plan view <br /> At <br /> Hillside <br /> Gully0.10' -IW 0•--20 0 <br /> 0 0 ' <br /> Tank 875-31 R <br /> Asphalt pavement 20 n• (55 gallon drum) <br /> Concrete pad <br /> 0 0 <br /> L8 _1 <br /> /A <br /> Cross section <br /> Legend <br /> I <br /> A A—A' Line of Ion <br /> I <br /> First ph soil sample styes. <br /> (same scale as plan view) ® Samples will be taken at 1',3', <br /> Hillside <br /> 5',and 10'. <br /> -� <br /> Concrete padSecond phase soil sample sites. <br /> ® Samples will be taken after <br /> excavation of the tank and <br /> 55al.drum concrete pad.The depth of the <br /> g Gully sam 1 ill be 6"to 1'below <br /> with concrete P <br /> e Ing "�"' the excavation. <br /> Scale:Feet <br /> Imo"" , iiR <br /> 0 10 20 <br /> Appendix A. Pian view of proposed soil sample locations for the closure of the 875.31 R tank. <br />