My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 10:55:40 AM
Creation date
6/3/2020 9:55:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 5
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TANK 614-D1 U1 CLOSURE <br /> Scope of Work• <br /> 1. Empty any liquid from the tank and lines, if applicable,with approved recycler. <br /> 2. Provide venting of fumes from the tank and lines, prevent static discharge. <br /> 3. Remove concrete and excavate overburden stockpile per LLNL Field Inspector. <br /> Do not dispose of overburden. <br /> 4. Disconnect the fill spout, supply return, vent and any other pipelines from the <br /> tank. <br /> 5. Remove and cap pipe lines. NOTE: The tank venting must be maintained. Drill <br /> a 1/8"hold in one cap on the tank. <br /> 6. Unbolt tank from concrete pad (if applicable). <br /> 7. Lift and remove the tank. The tank shall be scrapped by a certified scrapper. <br /> 8. Remove the concrete pad below the tank (if applicable). <br /> 9. Test for contamination per the Closure Plan LLNL to provide approval and <br /> location for soil. <br /> 10. Backfill with excavated or engineered/select soil, compact in 8"layers at <br /> 95% relative compaction. <br /> 11. Finished surface to match existing. <br /> 12. Protect all existing structures and utilities against damage during construction. <br /> Repair or replace all damaged structures, utilities and landscaping. <br /> General Notes: <br /> A. Construction personnel shall follow all appropriate safety rules and regulations as <br /> associated with work on fuel tank systems. See the "Closure Plan"and <br /> reference API 1604"Removal of Petroleum UST". All required procedures and <br /> regulatory requirements for tank closure shall be followed and coordinated with <br /> the Tank Assessments and Guidance Group(TAGG) of the Environmental <br /> Protection Department. <br /> B. Method of construction will be by Plant Engineering- "Shops". <br /> C. For reference only see Sketch SKM93-814-002A. <br /> FILE WWE:SM-09.OWG <br /> �,„ JENNIN'GS WE 5 19 93 �® Lawrence Livermore National Laboratory <br /> Sh NF _��Q--- 19 93 Livermore, CA 94550 <br /> APMW. 0 <br /> TNK-92-012 scm, NO SCALE SKETCH N0. SKM93-814-001 A <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.