Laserfiche WebLink
8. a. Describe the method that will b&ized to purge and/or inert the tank(s): <br /> g ice will be added(at least 5 pounds) to adeauat-IX jnM the tank. <br /> b. Tank/Piping Hauler: <br /> Name Erickson Enternrises <br /> Address _255 Parr Blvd. City Tracy Zip 94801 <br /> Phone No. ( 510 ) 262-1500 <br /> Hauler Registration # (if hauled as hazardous) 0019 <br /> c. Tank/Piping Disposal Site: <br /> Name Erickson Enterprises <br /> Address _255 Parr Blvd, City Tracy Zip 94801 <br /> Phone No. ( 510 ) 262-1500 <br /> EPA ID # (if transported to a permitted TSD facility) CAD 009466392 <br /> 9. Describe in detail how the soil and/or water sample(s)beneath the tank's invert and piping will be obtained: <br /> $gpresentative soil samples will be collected from the bucket of the backhoe. Stainless steel sampling tubes will beag eked <br /> with undisturbed native soil. ThP tube ends will be covered with Teflon sheets and sealed with plastic end capes <br /> S plea will be placed in a cooler with ice an_d logged onto a chain of custody r�ord for submitL[o a state-certified <br /> analytical laboratory. <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> The excavation will be left open and secured 2griding the evaluation of laboratory analytical results of the soil <br /> samples,and the case status of this project by the PHS-EHD The excavation will eventuallybe backfilled in <br /> accordance with County of San Joaquin Building Depa_ffment requirements. <br /> 11. Handling of excavated soil: <br /> a) What material will be used to line the tank pit and cover the stockpile? <br /> Sheets of PolYethylene <br /> b) What will be the final destination of the excavated stockpile? <br /> On-site bioremediation or if not contaminated. the soil will be returned to the excavation. <br /> c) Contaminated Soil Hazardous Waste Hauler. <br /> Name _N/A,on site bioremediation Hauler Registration # <br /> Address _ City Zip <br /> Phone No. ( ) <br /> 5 <br />