Laserfiche WebLink
PROJECT TITLE: SITE 300 BUILDING 8002 P.O.No. -2080803 <br /> J. R. No. <br /> TO: G.S.E CONSTRUCTION CO. , INC. <br /> 2402 RESEARCH DR. SUBMITTQL.No ,., r. ., - . 6 <br /> R: <br /> LIVERMORE, CA. 94550 _ SPEC'-SECTION 15991 <br /> (SUBCONTRACTOR & ADDRESS) <br /> SUBMITTAL RECORD <br /> Retain bottom copy before forwarding <br /> SUBJECT <br /> FUEL OIL SYSTEM .. <br /> ACTION TAKEN DATE DATE <br /> QUANTITY Retain <br /> (Initial) Y SENT REC'D. PRINT MFG. SAMPLE SEPIA Copy N <br /> SUBCONTRACTOR TO CM 8/17/87 6 6 <br /> y CM TO DESIGN MANAGER /t`I/ b 5 <br /> z <br /> 0 <br /> W DESIGN MANAGER TO CM NS 4 <br /> m <br /> m � <br /> 0 <br /> M <br /> v � CM TO INSPECTOR N.A. <br /> in <br /> 9 <br /> w <br /> CM TO PROCUREMENT <br /> in z <br /> LM <br /> LU <br /> Q <br /> N A <br /> Lu <br /> a a W LU CM TO SUBCONTRACTOR :::::: ::::: Z <br /> a a Ir o <br /> D WG. NO. DATED DESCRIPTION <br /> 8/17/87 SECTION 15991 FUEL OIL SYSTEMi <br /> V ' <br /> PLANT ENGINEERING DEPARTMENT DESIGN MANAGER/ENGINEER <br /> CONSTRUCTION MANAGER <br /> DISTRIBUTION: <br /> WHITE: CANARY: <br /> LL 5313(Rev.8/84) BLUE: Construction Manager PINK: <br /> 0REEN' Uartract Aoninistrator <br />