My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 6
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 12:47:57 PM
Creation date
6/3/2020 9:55:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 6
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 6.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M C M <br /> wrence Livermore National Laboratory <br /> csr�,1 if <br /> »` <br /> SA06 January 17, 1994 <br /> Mr. Bill Snavely <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> Post Office Box 2009 <br /> Stockton,Ca. 95201 <br /> SUBJECT: December Monthly Tank Integrity Testing Results <br /> Dear Mr. Snavely: <br /> Enclosed is a list of the monthly tank integrity testing results for three Lawrence <br /> Livermore National Laboratory (LLNL) Site 300 underground petroleum tanks <br /> having capacities of 2,000 gallons or more. Tanks 827-D1U1, 865-D1U1, and 879- <br /> D1U1 were integrity tested and found to be leak tight. <br /> Monthly tank integrity testing is performed to satisfy the requirements of Title <br /> 23,California Code of Regulations, Division 3,Chapter 16 Underground Tank <br /> Regulations, Section 2643 (c), (1). <br /> All integrity tests for the month of December were completed using Horner EZY- <br /> CHEK test equipment operated by state licensed tank tester, Mr. Richard J. Silva <br /> (License No. 91-1437) of Clayton Environmental Consultants, Inc., Pleasanton, <br /> California. The Clayton test reports are enclosed. <br /> As you were informed on January 7, 1994,there is some doubt to the validity of the <br /> tank data due to the omission of the constant pressure chamber during the tests. <br /> We are in the process of securing a contract with another state licensed tank tester <br /> to retest these USTs. We will submit these results to you within 30 days of receipt <br /> of the written test report. Enclosed are the results of the integrity tests for <br /> December. <br /> If you require additional information or have questions regarding the integrity <br /> testing procedure or results,please call Richard Henry of the Tank Assessments <br /> and Guidance Group (510) 423-3641. <br /> Sincerely, <br /> �J <br /> Susi Jackson, Di 'on Leader <br /> Operations and Regu atory Affairs <br /> Environmental Protection Department <br /> CSJ/DC:kp <br /> Enclosures <br /> An Equal Opportunity Employer•Universityof California•P.O Box 808 Livermore,California 94550•Telephone(415)422-1100•Twx 910-386-8339 UCLLL LVMR <br />
The URL can be used to link to this page
Your browser does not support the video tag.