Laserfiche WebLink
Western Operations <br /> 1252 Quarry Lane Dayton <br /> P.O. Box 9019FALTH <br /> Pleasanton, CA 94566 <br /> (510)42&26M ENVIRONMENTAL <br /> CONSULTANTS <br /> Fax(510)4260106 <br /> JA'I 2 Pil 2: 06 <br /> December 18, 1993 <br /> Mr. David Castro <br /> LAWRENCE LIVERMORE NATIONAL LABORATORY <br /> P.O. Box 808, L-633 <br /> Livermore, California 94550 <br /> Clayton Project No. 38641.00 <br /> Subject: Tank Integrity Testing Results <br /> Dear Mr. Castro: <br /> Clayton Environmental Consultants, Inc. is pleased to report the results and <br /> observations of the tank integrity tests recently completed at: <br /> Lawrence Livermore National Laboratory <br /> Building 871 - Site 300 <br /> Tracy, California <br /> The tank was tested on December 2, 1993, using the Homer EZY-CHEK tank testing <br /> system. <br /> The results of the tests are provided below. <br /> ...................... <br /> 871-DlU1 2,000 Diesel -High -0.0172 <br /> GPH @ 95% confidence of <.1 as accepted by the State of California and the <br /> Environmental Protection Agency. <br /> The tank was shown to be "product tight." <br /> ENG13%41-0t13 <br /> Clayton Environmental Consultants,Inc. * Detroit 0 New York/Newark e Atlanta . San Francisco • Los Angeles <br /> Honolulu - Windsor,ON - Toronto - Birmingham,U.K. - London,U.K. & Southampton,U.K. • Gateshead,U.K. <br />