Laserfiche WebLink
Western Operations <br /> 1252 Quarry Lane <br /> P.O. Box 9019 Clayton <br /> Pleasanton,CA 94566 ENVIRONMENTAL <br /> (510)4262600 <br /> Fax(510)426-0106 CONSULTANTS <br /> October 11, 1993 <br /> Mr. David Castro <br /> LAWRENCE LIVERMORE NATIONAL LABORATORY <br /> P.O. Box 808, L-633 <br /> Livermore, California 94550 <br /> Clayton Project No. 38641.00 <br /> Subject: Tank Integrity Testing Results <br /> Dear Mr. Castro: <br /> Clayton Environmental Consultants, Inc. is pleased to report the results and <br /> observations of the tank integrity tests recently completed at: <br /> Lawrence Livermore National Laboratory <br /> Site 300 <br /> Tracy, California <br /> The tank was tested on October 5, 1993, using the Homer EZY-CHEK tank testing <br /> system. <br /> The results of the tests are provided below. <br /> Capacity Results <br /> Tank (Gallons) Product Level. (Galft) <br /> 827-DlUl 8,000 Diesel High -0.01673 <br /> GPH @ 95% confidence of <.1 as accepted by the State of California and the <br /> Environmental Protection Agency. <br /> The tank was shown to be "product tight." <br /> E)MI&M-6411ronmental consultants,Inc. * Detroit * NewYork/Newark # Atlanta a San Francisco * Los Angeles <br /> Honolulu * Windsor,ON - Toronto e Birmingham,U.K. * London,U.K. - Southampton,U.K. - Gateshead,U.K. <br />