My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 7
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 1:28:25 PM
Creation date
6/3/2020 9:55:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 7
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 7.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
509
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
USt SYSTEM PRINTSET INFORMATION <br /> T1%r-e.e- <br /> 1. _, complete sets of plans (To include specification sheets and/or equipment brochures if not on file). <br /> 21. Plans drawn to scale in no -erasable print. <br /> • <br /> s• Plot plan to show location and number of tanks. <br /> 4. Tank cross-sectional diagram included on prints submitted. <br /> 5. Detail of tank, piping system, excavation and cover. <br /> 6. s Tank(s) and piping approved by a nationally recognized independent testing organization. <br /> Article 3, Sec. 2631 Cr) L 26351 <br /> (Title 23, Subchapter ib <br /> T. Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, ate. (Section 2635 tb) (2)] <br /> 8• Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. (Section 2635 (b) (5) <br /> 9• Tightness Test (NFPA 30) is required on both primary (10) and secondary (20) containment syst befort covering. <br /> (Section 2635 (b) (6) 3 (T)l <br /> t0• Double walled tanks using pressure or vacuum testing to monitor the annular space. (Section 2635 (b) (7)] <br /> 11. NFPA 329 "Precision Test" required upon completion of installation with tank in operating condition. Test results t <br /> be submitted directly to PHS/EHO from the testing coopany or owner of facility. (health i Safety Code, Division 20 <br /> Chapter 6.T, Sectio' 25291 (g)) <br /> 12. TANK COMPOSITION <br /> TANK x # <br /> 5 # # # <br /> # <br /> CAPACITY �S <br /> MANUFACTURER ayv <br /> COMDOSITION 2 <br /> EL T1 PL u <br /> PRODUCT <br /> CORROSION PROTECTION (�,Q <br /> U.l. LISTED / <br /> COMPATIBILITY WITH 100% <br /> METHANOL <br /> 13. TANKCs) TO BE INSTALLED <br /> A. Steet-clad with fiberglass reinforced ptotic. <br /> Holiday test required innedfatety before "setting" tank(s) (35,000 40,000 volts). (Section 2635 (b) (4)] <br /> C.�ST't;FIbergLass (Sections 2635 (3) and 2631 (p)] <br /> (1) Striker plate dimensions and materials. <br /> (2) Striker plate under sit accessible openings. <br /> (3) Installation instructions require an air test end soap bubble test prior to installation. <br /> 0. Nan-clad steel tank (Section 2635 (b)] <br /> (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> (2) Approved by a corrosion engineer or N.A.C.E. technician. <br /> I) (3) Document stating inspection method and frequency (minimum semi-annual inspection requirement). <br /> 0 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.