My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 7
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 1:28:25 PM
Creation date
6/3/2020 9:55:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 7
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 7.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
509
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. Secondary container otheA double-walled tanks (includes intercepts <br /> and detection system). (Section 2633 (f)) <br /> ® A. Sackfilt in secondary container. [Section 2635 CO 1.81 <br /> \, ®. Pore space of granular material used as backfitt for primary container(s) complies with Section 2631 <br /> (g). [Engineering data to support capacity requiromm U. <br /> C. Two or more primary containers within secondary container. (include information on product <br /> compatibility) <br /> ® 0. Secondary container capable of precluding highest anticipated groundwater. <br /> E. Secondary container sloped to a monitoring sump from which leakage or precipitation can be detected <br /> ® and removed. <br /> F. Yater tight corner which extends at least a foot beyond each boundary of the secondary container <br /> excavation, sloped to drain away from excavation. <br /> 20. Secondary container(s) thickness, density, composition, product compatibility. <br /> LI Sized to contain unauthorized releases from primary containers to allow sufficient time for detection and removal. <br /> [Section 2631 CO] <br /> 21. v Secondary container(s) volumetric requirements: (Section 2631 (e) (1) <br /> and (2)) <br /> A. Single primary containers • 100%. <br /> I. Multiple primary containers a 150% of largest primary container or 10% above aggregate. <br /> 22. Secondary containers) open to rainfall. ( Section 2631 (f)1 <br /> volumetric requiromm is s 24 hairs of 100 year store in addition to primary container volumes. <br /> Z3. <br /> Secondary container floor. (Sectio' 2631 (i)1 <br /> 0 <br /> A. Constructed on fire base. <br /> a. sloped to collection sump ( 1/8 inch per foot). <br /> (1) one or more access casings installed in <br /> (a) Size to allow ramovsk of collected liquid. <br /> ® (b) Extv to grand surface. <br /> CO Covered with a locked waterproof cap or <br /> within a secured facility. <br /> _ (d) thickness allows for anticipated stresses. <br /> (e) Construction materials are not weakened stored product or wilt not donate, <br /> capture, or mask constituents to be monitored. <br /> 24. Membrane timer specifications. (Section 2631; k, t, and a) <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.