My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_1986-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 9:51:48 AM
Creation date
6/3/2020 9:56:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2001
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_1986-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />UNDERGROUND TANK INSPECTION RECORD <br />NEN TANK INSTALLATION <br />SITE NAME II ( INSPECTOR'S NAME <br />...ADDRESS ( J4 0 27717 / elf CITY 21P A52D4_ <br />CONTRACTOR: NAME IlJ ®IL( PHONE <br />OWNER: NAME PHONE <br />DIS INSPECTOR'S -- <br />DATE kPPROVED kPPROVEb INITIALS <br />ITEM OR EQUIPMENT INSPECTED <br />1. fees paid <br />2 „ . Plans Approved <br />Coanents: <br />EN 23 006 10/89 — -- <br />INITIAL INSPECTION <br />1. UL nurbers3IDL46 tank size ( D f boo qAL- <br />PIPING STAGE INSPECTION %Q- °� <br />Pressure test of piping. (Primary and Secondary (NFPA 30)) <br />r y <br />2. tank tested upon delivery [Holiday (plasteel) or air at 5 PSI (FRP)) <br />.�, <br />2. Ball float valves installed. <br />. Visual inspection of secondary containment. <br />2. Spill protection at fill pipe.. <br />. Tank appropriately placed with approved backfill. <br />Coanents: <br />EN 23 006 10/89 — -- <br />PIPING STAGE INSPECTION %Q- °� <br />Pressure test of piping. (Primary and Secondary (NFPA 30)) <br />r y <br />.�, <br />2. Ball float valves installed. <br />2. Spill protection at fill pipe.. <br />3. overfill protection installed, describe: 1 f <br />3. Performance test of overfill protection system., <br />'r °L <br />Unused tank opening sealed and cathodically protected. 00 UjI(%54 <br />q( <br />4. Performance test of product line teak detector. (Hard wired) <br />5. Visual Inspection of secondary containment on piping. <br />--�j <br />6. Monitoring ports In place and brought to grade. (lockable weather proof covers) <br />g <br />7. Fill and vent piping brought to grade. ? <br />f �I <br />-V/ <br />/ �✓ <br />8. Product line teak detector in place. (Hard wired) <br />{ of <br />7. Acceptable recordkeeping system. <br /><V <br />97 Approved tank teak monitoring device installed. e <br />akk� 547 <br />�( <br />10. All galvanized piping and fittings properly wrapped. <br />11 ? Pressure decay test on complete tank And product delivery system. <br />Coanents: <br />EN 23 006 10/89 — -- <br />FINAL INSPECTION <br />1. Precision test successfully completed and hard copies received. (NFPA 329) <br />2. Spill protection at fill pipe.. <br />3. Performance test of overfill protection system., <br />'r °L <br />4. Performance test of product line teak detector. (Hard wired) <br />5. Performance test of continuous monitoring system(s) on tank (s) <br />6. Permit to operate application complete. <br />7. Acceptable recordkeeping system. <br />Coanents: <br />EN 23 006 10/89 — -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.