My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_1986-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 9:51:48 AM
Creation date
6/3/2020 9:56:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2001
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_1986-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TAIT & ASSOCIATES, INC. <br />Consulting Engineers <br />January 25,1991 <br />San Joaquin County <br />Public Health Services <br />P.O. Box 2009 <br />Stockton, CA 95201 <br />Attn: Kasey Foleya� <br />✓q <br />Re: BP Oil, 1403 Country Club. ���;),r:�,•` 0 <br />Subject: Plan Check response. P i'''✓,Oil" "Z, <br />Dear Kasey, <br />The following items are in response to your questions and <br />concerns regarding the BP Oil project at 1403 Country Club Blvd. <br />1. BP Oil will provide overfill protection by installing an <br />11OPW-6I-S0 shut-off device. On the fill tube, set at 95% <br />of tank capacity(in addition to all other equipment shown <br />on the approved drawings). <br />2. BP Oil will install a tank gauge, Veeder Root TLS 250 or <br />equivalent. At the time the tanks are installed. The <br />approved drawings indicate "Future installation of the <br />tank gauge" which is incorrect. <br />3. The manager of the facility will be Denise White (she is <br />also the current manager) phone (209) 943-2082. <br />4. Mr. Pete DeSantis is the contact person at BP <br />Environmental Group and is authorized to order clean up. <br />5. Investigation and clean up will be by contract with IT <br />Corporation. <br />6. The 24 hour contact person will also be Mr. Pete DeSantis <br />(916) 631-6919. <br />We have contacted IT Corporation and requested that they <br />contact you to resolve any problems with their portion of the <br />submittal. <br />7803 Madison Avenue / Suite 370 / Citrus Heights, CA 95610 / (916) 966-9011 / FAX (916) 965-0526 <br />
The URL can be used to link to this page
Your browser does not support the video tag.