My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 10:56:18 AM
Creation date
6/3/2020 9:56:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FDRW— r <br /> L <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-j!m 1 of?l VED <br /> TYPE OF ACTION 0 1 NEW PLAN [3 2.CHANGE OF INFORMATION o e) -nno 490-1 <br /> PLAN TYPE [3 1 MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. 4W2 <br /> (Check one item only) 0 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYS <br /> Y 's <br /> FACILITY 0#(Agency Use 0*) EM <br /> BusmEss NAME(same as FACILITY NAME)Kayo Oil Compmy site 2705"6 3. <br /> Busums SITE ADDRESS 1403 COUNTRY CLUB BLVD 1o3. CITY STOCKTON 104. <br /> 7 7, <br /> Tesbn&preventive nimintonarme,and calibration of mondoring equipment(e g.,s—om probm line leak dowma,etc.)must be performed at the fiviluency <br /> specified by the equipmout manuflocturm'kistructions,or annually,whichever is more fivqwK and that such work must be performed by qualified personnel. <br /> 23 CCR JW2,2634,2631,264 Imo_ <br /> s <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY 99.OTHER(Specify): 490-3 490-3b <br /> 77NZ <br /> 0 1.NEW SITE PLOT PLAN SUB WITHTHIS PLAN. 2.SITE PLOT PLANIMAP PREVIOUSLY SUBMITTED. (23 CCR <br /> 2634 <br /> N 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INMMSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: J5 a.2EI!�g b.LIQUID FILM 0 c.PRESSURIZED 0 d.UNDER VACUUM 49" <br /> PANEL MANUFACTURER- Veeder-Rodt TLS350 49M <br /> LEAK SENSOR MANUFACTURER Veeder-Root 49"- 1 MODEL#(S): 302 4O-10 <br /> 13 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USMID TO MONITOR MMU MU IAWJJ&(23 CCR V&3) 40-11 <br /> PANEL MANUFACTURER. 490-11 MODEL 0: 490-13 <br /> IN-TANK PROBE MANUFACTURER. 494-14. MODEL!LS): 00-15 <br /> LEAK TEST FREQUENCY: 0 &CONTINUOUS 0 b.DAILY/NIGHTLY El c.WEEKLY 490-16 <br /> 13 d.MONTHLY c.OTHER @peogy): 490-17 <br /> 490-18 <br /> PROGRAMMED TESTS: 13 &0.1&PIL 0 b,02 gp.h. 0 c.OTHER(Specify): 490-19 <br /> E3 3.MONTHLY STATISTICAL INVENTORY RECONCILJATION(23 CCR§2646.1): 490-20 <br /> (3 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: [3 a.36 HOURS [3 b.60 HOURS 490-210&22 <br /> E3 S.TANK INTEGRITY TESTING(23 CCR§2643.1): 49&23 <br /> 490 <br /> TEST FREQUENCY: 0 a.ANNUALLY 0 b.BIENNIALLY [3 c,OTHER(Specify): -24 490-25 <br /> 490- <br /> ❑99.OTHER (Spm*). 26 49062 7 <br /> tb <br /> 99 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OITIER SECONDARY CONTAINMENT wrrH AUDIBLE AND 490-23 <br /> VISUAL ALARMS. C23 CCR§2636) <br /> SECONDARY CONTIS:IS:W DRY Ob.LIQUID FILM [3c.PRESSURIZED Od.UNDER VACUUM 4W29 <br /> PANEL MANUFACTURER.Veedw-Root 490-30 MODEL#• TLS350 Mn31 <br /> LEAK SENSOR MANUFACTURER- Veeder-Root 49"2 MODEL#(S): 208 490-33 <br /> PIPING LEAK ALARM MUGGERS AUTOMATIC PUMP(kc,TURBINE)SHUTDOWN. IM a.YES [3 b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN 0 a.YES 0 b NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 gph.LEAK TESTS AND RESTRICTS OR SUM OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR 9636) 490-36 <br /> muD mmwAcTuRER(sy FE-Petro 033' MODEL#(S): STP-MLD 490-38 <br /> 13 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORM 3A g4LL LEAK TESTS (23 CCR VA36) 490639 <br /> ELLD MANUFACTURER(S) 49040. MODEL#(S): 490-41 <br /> PROGRAMMED IN LINE LEAK TEST- ❑ I MINIMUM MONTHLY 0.2&plL [3 2-MR41MUM ANNUAL 0.1 gp1L 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN Cls.YES 0b.NO 490-0 <br /> ELLD FAILURE/DISCONNECTION MUGGERS AUTOMATIC PUMP SHUTDOWN. ®a YES 11 b.NO 4W-" <br /> [3 4.PIPE INTEGRITY TESTING.mos <br /> TEST FREQUENCY C3 s.ANNUALLY Q b.EVERY 3 YEARS Q c.OTHER LS222M 49046490,47 <br /> S.—VMAL PIPE MONITORING. 49048' <br /> FREQUENCY [3 &DAILY [3 b.WEEKLY 0 c.MEN.MONTHLY&EACH Tam SYSTEM aPL1tATFD* <br /> 0 6 sucuoN PIPING MEETS EXEMPTION CRITERIA[23 CCR p6Wa)(3)j. 490-50 <br /> [3 7 NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 24,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 4W51 <br /> 13 99.OTHER(specify) 490 s3 <br /> UPCF UST-D(1 i/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.