Laserfiche WebLink
SAN JOAQUIN COUNTY <br />• ENVIRONMENTAL HEALTH DEPARTMEO <br />600 East Main Sireet, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sjgov.or /g ehd <br />FACILITY NAME <br />FACILITY CONTACT NAME <br />7 -Eleven #2368-32190 <br />2004 <br />FACILITY ADDRESS <br />SITE PHONE # WITH AREA CODE <br />4943 S State Hwy 99 <br />209 939-0679 <br />CITY <br />I STATE <br />ZIP CODE <br /># OF TANKS AT SITE <br />Stockton <br />ICA <br />95215 <br />3 <br />APPLICANT BILLING NAME <br />APPLICANT CONTACT NAME <br />CLOSURE FEE = $315 / TANK <br />2004 <br />APPLICANT MAILING ADDRESS <br />APPLICANT PHONE # WITH AREA CODE <br />2007 <br />2008 <br />CITY <br />STATE <br />ZIP CODE <br />CIRCLE WORK TO BE DONE <br />CONTRACTOR ICC # <br />Closure Installation Repair Retrofit <br />$550 FEE INCLUDES FACILITY FEE + 1 TANK (2009) <br />ACTIVE FACILITY <br />TANK ID # (s): <br />CLOSURE FEE = $315 / TANK <br />2004 <br />2005 <br />2006 <br />2007 <br />2008 <br />2009 <br />$500 FEE INCLUDES FACILITY FEE + 1 TANK (2003-2008) <br />$ 345 <br />PIPING REPAIR FEE = $315 / FACILITY (use for piping, under -dispenser containment, ect.) <br />SAMPLING INSPECTION FEE _ $ 105/ HOUR <br />$550 FEE INCLUDES FACILITY FEE + 1 TANK (2009) <br />$ <br />$125 PER TANK AFTER FIRST TANK <br />TANK PENALTY ASSESSED <br />TANK SURCHARGE = $15 / TANK <br />$ <br />STATE SURCHARGE FOR FACILITIES NOT ALREADY ON INVENTORY IN A CUPA PROGRAM =$24.00/ FACILITY <br />PERMANENT CLOSURE <br />Removal or Permitted Closure in Place) <br />TANK ID # (s): <br />CLOSURE FEE = $315 / TANK <br /># TANKS X $315 = <br />TEMPORARY CLOSURE <br />(Plan Review and Inspections) <br />TANK ID # (s) : <br />TEMPORARY CLOSURE FEE = $315 / FACILITY <br />INSTALLATION PLAN CHECK <br />Plan Check and Construction Inspections) <br />TRANSFER FEE _ $ 20 <br />TANK RETROFIT REPAIR FEE = $315 / FACILITY (use for monitoring equipment, cold starts, EVR upgrades, <br />TANK ID # (s) : <br />PLAN CHECK FEE = $840 / FACILITY <br />REPAIR PLAN CHECK <br />TANK ID # (s) : <br />TRANSFER FEE _ $ 20 <br />TANK RETROFIT REPAIR FEE = $315 / FACILITY (use for monitoring equipment, cold starts, EVR upgrades, <br />spill buckets, sumps, misc. <br />$ 345 <br />PIPING REPAIR FEE = $315 / FACILITY (use for piping, under -dispenser containment, ect.) <br />MISCELLANEOUS <br />TRANSFER FEE _ $ 20 <br />CONSULTATION FEE _ $ 105/ HOUR <br />UNAUTHORIZED RELEASE EVALUATION FEE = $ 105 / HOUR <br />SAMPLING INSPECTION FEE _ $ 105/ HOUR <br />ALL FEES ARE BASED ON THE $105 HOURLY RATE. TIME THAT EXCEEDS FEES PAID WILL BE BILLED TO APPLICANT. <br />OFFICE USE ONLY <br />SERVICE REQUEST #FACILITY ID AMOUNT RECEIVED CHECK # RECEIVED BY DATE RECEIVED <br />SR <br />Fu wz nz? tom/mm nen inav <br />