Laserfiche WebLink
ra�Pgi co <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.s*gov.org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />Inspection Date: <br />Leak detector <br />-7— 30 <br />Facility Address: <br />Service Request #: <br />X03 <br />1 <br />Onsite Service Technician's N me: <br />ICCervice Technician/Installer Exp. Date: <br />Manufacturer Training: <br />❑ <br />,'ve, -211 V <br />cnh- , fc.,7 <br />SERVICE <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />THIS FACILITY IS SUBJECT TO REINSPECTIO Y TIME AT EHD'S CURRENT HOURLY RATE. <br />❑ electronic Serial #: <br />Received y: <br />❑ line test programmed <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />5 <br />SERVICE <br />s <br />0j I Spill bucket minimum 5 gallon <br />THIS FACILITY IS SUBJECT TO REINSPECTIO Y TIME AT EHD'S CURRENT HOURLY RATE. <br />Rl hour hydrostatic ❑ [neon TS -STS <br />Received y: <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ [neon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 20 containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />1-17 <br />THIS FACILITY IS SUBJECT TO REINSPECTIO Y TIME AT EHD'S CURRENT HOURLY RATE. <br />EHD Insp r: <br />Received y: <br />Title_ <br />/ I V - V 4c--� <br />EHD 23-04 V <br />Rev 11/17//08 <br />UST SERVICE REQUEST INSPECTION REPORT <br />