Laserfiche WebLink
• • <br />Spill Bucket Testing Report Form <br />SWRCB, January 2006 <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (f applicable) should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: CRLLC #2705446 <br />Date of Testing: MAY 14, 2009 <br />Facility Address: 1403 COUNTRY CLUB BLVD, STOCKTON, CA 95204 <br />Facility Contact: CHUCK SOFTICH I Phone: (253) 437-5980 <br />Date Local Agency Was Notified of Testing: MAY 6, 2009 <br />Name of Local Agency Inspector (if present during testing): GARRETT BACKUS <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: TANK-TEK ENVIRONMENTAL CORPORATION <br />Technician Conducting Test: RICHARD THOMAS <br />Credentials': ® CSLB Contractor ® ICC Service Tech. ® SWRCB Tank Tester ❑ Other (Spec) <br />License Number(s): 803705 (CSLB Contractor) -- 5297888 -UT (ICC Service Tech.) -- 06-1672 (SWRCB Tank Tester) <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: ® Hydrostatic ❑ Vacuum ❑ Other (Specify) <br />Test Equipment Used: VISUAL <br />Equipment Resolution: <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc.) <br />DIESEL FILL <br />87 FILL <br />91 FILL <br />'[ <br />ucket Installation Type: <br />® Direct Bury <br />❑ Contained in Sump <br />® Direct Bury <br />❑ Contained in Sump <br />® Direct Bury <br />❑ Contained in Sump <br />❑ Direct Bury <br />❑ Contained in Sump <br />Bucket Diameter: <br />16.00" <br />16.00" <br />16.00" <br />Bucket Depth: <br />12.50" <br />12.50" <br />12.50" <br />Wait time between applying <br />vacuum/water and start of test: <br />15 MIN <br />15 MIN <br />15 MIN <br />Test Start Time (Tj): <br />1:30 PM <br />1:30 PM <br />1:30 PM <br />Initial Reading (RI): <br />12.50" <br />12.50" <br />12.50" <br />Test End Time (TF): <br />2:30 PM <br />2:30 PM <br />2:30 PM <br />Final Reading (RF): <br />12.50" <br />8.25" <br />12.50" <br />Test Duration (TF — TI): <br />1 HR <br />1 HR <br />1 HR <br />Change in Reading (RF - RI): <br />0 <br />- 4.25" <br />0 <br />Pass/Fail Threshold or Criteria: <br />Test Reul <br />st: <br />® Pass ❑ Fail <br />❑ Pass ® Fail <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />COMMentS - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />87 FILL BUCKET FAILED DUE TO DRAIN VALVE ASSEMBLY & DUST CAP -- NEEDS TO BE REPLACED <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: � —�- J <br />Date: MAY 14, 2009 <br />' State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />