Laserfiche WebLink
SWRCB,January 2002 Page 7 <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer F] Industry Standard �X Professional Engineer <br /> 0 Other (Specify) <br /> Test Method Used: ❑ Pressure F-1 Vacuum X❑ Hydrostatic <br /> Other (Spec) <br /> Test Equipment Used: vplt Equipment Resolution: <br /> UDC# 1/2 UDC# 3/4 UDC# 5/6 UDC# 7/8 <br /> UDC Manufacturer: bravo bravo bravo bravo <br /> UDC Material: metal metal metal metal <br /> UDC Depth: 1011 1011 1011 1011 <br /> Height from UDC Top to Top of 0 0 0 0 <br /> Highest Piping Pentration: <br /> Height from UDCTop to Lowest 0 0 0 10 <br /> Electrical Pentration: <br /> Condition of UDC prior to testing: good good good good <br /> Portion of UDC Tested: 1 211 211 211 211 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X]Yes❑No[:]N MYes F—]No[::]N Yes❑NoE:]N E Yes❑No[]N <br /> product and water)?* <br /> Turbine shutdown response time: 2-5sec 2-5sec 2-5sec 2-5 s e c <br /> Is system programmed for fail-safe ❑ � ❑ X ❑ ❑ ❑ <br /> shutdown?* Yes X N N Yes N N Yes X N N Yes ENoaA <br /> Was fail-safe verified to be ❑ ❑ ❑ ❑ ❑ <br /> operational?* Yes X N N Yes X N N Yes X N N Yes X No <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min 5min 5min 5min <br /> test: <br /> Test Start Time: 10:19 9:56 11:2 2 11:44 <br /> Initial Reading(R1): 7.032 4.657 12 .682 9.763 <br /> Test End Time: 10:34 10:11 11:37 11:59 <br /> Final Reading(RF): 7.032 4.638 12 .682 9.763 <br /> Test Duration: 15min 15min 15min 15min <br /> Change inReading(RF-R1 ): .000gph 001gph .000gph .000gph <br /> Pass/Fail Threshold or Criteria: .05gph .05gph .05gph .05gph <br /> EffiffieffiffiRm EMEM ", I ONE= <br /> Was sensor removed for testing? YesI" No❑NA❑YesL.L j Yes X N NA Yes ENoaA <br /> Was sensor properly replaced and �verifed functional after testing? ❑Ye XN NAF11 1 _1 YesMNc1_1 NA ❑Ye�N�NA[]Yes <br /> Yes X Nq: <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested.If the answer to a�of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />