Laserfiche WebLink
Facility: Hammer I-5 Arco Page 2 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 325.02 <br /> Complete the following checklist: <br /> ®Yes ❑ No* Is the audible alarm o erational? 0 Outside Audible Alarm? <br /> ®Yes ❑ No* Is the visual alarm o erational? <br /> ®Yes ❑ No* Is the 2rint function operational? 0 Not installed. <br /> ®Yes ❑ No* Were all sensors visualIX inspected, functionalIX tested,and confirmed operational? <br /> ®Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their 2ro2er o eration? <br /> ❑Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> ® N/A operational? <br /> ®Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) ® Sump Sensors; ❑ Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ®Yes; ❑No. <br /> ❑Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> ® N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill 2oints)and operating ro erl ? If so,at what Eercent of tank cMacity does the alarm trigger? <br /> ❑Yes* ® No Was any monitoring equipment replaced? If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all re lacement parts in Section E,below. <br /> ❑Yes* ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> Yes No* Was monitorinEa astern set-un reviewed to ensure proper settings?Attach set up reports, if applicable <br /> Yes No* I Is all monitorin a ui mento erational 2er manufacturer's s ecifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: No Deficiencies. <br /> Page 2 of 3 03/01 <br />