My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_2011-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 10:16:11 AM
Creation date
6/3/2020 9:56:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2018
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232224_3250 W HAMMER_2011-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Mr. Don Mukai -2- January 23, 2013 <br />Bravo, since dimensions of the new dispenser and the existing UDC determine the size <br />and angle of the sloped weirs. <br />Review Process of the CONV-B2000 <br />Pursuant to California Code of Regulations (CCR). Title 23, § 2636(g)(3), we have <br />reviewed the application to determine whether the system,adequately protects the soil <br />and beneficial uses of groundwater. During the review process the State Water Board <br />received and reviewed the following documents* Dispenser Conversion Frame, Model <br />CONV-B2000 product literature; State Registered Professional Engineer Approval I letter; <br />Conversion Frame Specirications, and Bravo Conversion Frame InstalletionlInspection <br />Manual. A California registered Professional Engineer has reviewed the Bravo catalog <br />sheet with specifications and the B2000 Conversion Frame Installation Instructions and <br />has concluded that the frame is acceptable for adapting -an existing installed UDC to a <br />new dispenser (See Enclosure 2). <br />Conditions of Approval for the CONV-B2000 <br />Based on the Professional Engineer's review and the documentation you've submitted, <br />we are granting approval of the CONV-B2000 under the following conditions: <br />0 4 all' <br />04 <br />2. Materials and procedures employed in the construction of the CONV-B2000 shall <br />remain the same as the materials that were indicated in the documents reviewed <br />by the State Water Board. <br />3. Installation procedures in no way supersede local, State, and federal regulations. <br />Qualified individuals must obey all local laws, regulations, and requirements <br />when installing the CONV-B2000. <br />4. The procedures s'iiiConversion Frame Installationlinspection Manual <br />dated August 21 j 2012) submitted in the approval process must be followed in <br />their entirety. Any variations in the installation procedures must be reviewed and <br />approved by the State Water Board, <br />5. Only qualifidd individuals meeting the requirements of CCR, Title 23, section <br />2715(h), including training and certification by the manufacturer (S. Bravo <br />Systems, Inc.), are allowed to install this product. <br />W <br />IP <br />
The URL can be used to link to this page
Your browser does not support the video tag.