Laserfiche WebLink
Facility: Hammer 1-5 Arco <br /> In-Tank Gauging / SIR Equipment: <br /> ®Check this box if tank gauging is used only for inventory control and disregard the following section. <br /> ❑Check this box if no tank gauging or SIR equipment is installed. <br /> Complete the following checklist: <br /> El Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground <br /> faults? <br /> ❑Yes ❑ No* Were all tank-gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑Yes ❑ No* Was accuracy of system water level readings tested? <br /> E]Yes ❑ No* Were all probes reinstalled properly? <br /> El Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> G. Line Leak Detectors (LLD): <br /> ❑ Check this box if LLDs are not installed and disregard the following section. <br /> ®Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD <br /> ❑ N/A performance? (Check a//that app/y) Simulated leak rate: ® 3 gph; ❑ 0.1 gph; ❑ 0.2 gph. <br /> ®Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ®Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ®Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> El Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ® N/A <br /> El Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> ® N/A is disabled or disconnected? <br /> ❑Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> ® N/A malfunctions or fails a test? <br /> EYesE]Ye ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> ❑ No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> H. Comments: No Deficiencies. <br /> Page 3 of 3 03/01 <br />