My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_2011-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 10:16:11 AM
Creation date
6/3/2020 9:56:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2018
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232224_3250 W HAMMER_2011-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• RECEO'1 OD <br /> P.O.Box 4208 <br /> JUL 0 2 2018 Sonora 4195370 <br /> AlitechPetr • Phone: <br /> 209-53 -7320 <br /> ENVIRONMENTAL HEALTH Phone:209-532-7320 <br /> Compliance without Compromise PERMMSERVCEs Fax:209-533-2650 <br /> mail@alltechpetro.com <br /> www.alitechpetro.com <br /> Secondary Containment Testing Report Form <br /> This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this <br /> form to report results for all components tested. The completed form, written test procedures,and printouts from tests(if applicable),should be <br /> provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: Hammer 1-5 Arco Date of Testing: 5/24/18 <br /> Facility Address: 3201 W. Hammer Lane Stockton CA <br /> Facility Contact: Wes Parkinson Phone: (209) 474-9125 <br /> Date Local Agency Was Notified of Testing : 5/16/18 <br /> Name of Local Agency Inspector (if present during testing): Aaron Hang <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: Alltech Petro Inc. <br /> Technician Conducting Test: Chad White <br /> Credentials: ® CSLB Licensed Contractor NSWRCB Licensed Tank Tester <br /> License Type: A-Haz License Number: 623541 A-haz <br /> Manufacturer Training <br /> Manufacturer Component(s) Date Training Expires <br /> Caldwell Sump Tester 04-13-20 <br /> 3. SUMMARY OF TEST RESULTS <br /> Component Pass Fail Not Repairs Component Pass Fail Not Repairs <br /> Tested Made Tested Made <br /> 87 Master Turbine Sump ® ❑ ❑ ❑ vapor Transition Sump ® ❑ ❑ ❑ <br /> 87 Syphon Piping Sump ® ❑ ❑ ❑ PipingTransition Sump ® ❑ ❑ ❑ <br /> 91 Turbine Sump ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ I ❑ I ❑ ❑ Vapor Pot evac chase line ® ❑ ❑ ❑ <br /> UDC 1/2 ® ❑ ❑ ❑ 87 Syphon Line ® ❑ ❑ ❑ <br /> UDC 3/4 ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 5/6 ® ❑ ❑ ❑ 87 Master Annular ® ❑ ❑ ❑ <br /> UDC 7/8 ® ❑ ❑ ❑ 87 Syphon Annular ® ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ 91 Annular N . ❑ ❑ ❑ <br /> 87 Product Line I ® I ❑ ❑ ❑ ❑ ❑ ❑ I ❑ <br /> 91 Product Line I ® ❑ ❑ Q-1 ❑ I ❑ ❑ I ❑ <br /> If hydrostatic testing was performed, describe what was done with the water after <br /> completion of tests: <br /> Testing water stored in barrels onsite <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements <br /> Technician's Signature: Date: 05/24/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.