My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_2011-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 10:16:11 AM
Creation date
6/3/2020 9:56:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2018
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232224_3250 W HAMMER_2011-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other (Specify) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used: Pressure Guage Equipment Resolution: 0 Change in <br /> 87 Master Product 91 Product 87 Syphon Vapor Pot Evac <br /> Chase <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Unknown Unknown Unknown Unknown <br /> Piping Diameter: 3 inches 3 inches 3 inches 3 inches <br /> Length of Piping Run: 50 Feet 50 Feet 8 Feet 12 Feet <br /> Product Stored: 87 octane 91 octane 87 octane 87/91 <br /> Method and location of Reducer Boot with Sealed off Reducer Reducer Boot with Reducer Boot with <br /> Schrader Valve in Boot after pipe Schrader Valve in Schrader Valve in <br /> piping-run isolation: transition Sump daylights transition Sump transition Sump <br /> Wait time between 10 minutes 10 minutes 10 minutes 10 minutes <br /> applying <br /> pressure/vacuum/water <br /> and starting test: <br /> Test Start Time: 10:45 14:00 10:00 10:45 <br /> Initial Reading (R,): 5.0 psi 5.0 psi 5.0 psi 5.0 psi <br /> Test End Time: 11:45 15:00 11:00 11:45 <br /> Final Reading (RF): 5.0 psi 5.0 psi 5.0 psi 5.0 psi <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading (RF R,): 0 psi 0 psi 0 psi 0 psi <br /> Pass/Fail Threshold or 0 psi change 0 psi change 0 psi change 0.005 inches in 1/2 <br /> Criteria: hour <br /> Test Result: ® Pass ❑ Fail Pass ❑ Fail ® Pass ❑ Fail ® Pass Fail <br /> Comments — (include information on repairs made prior to testing, and recommended follow-up for failed <br /> tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.