My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_2011-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 10:16:11 AM
Creation date
6/3/2020 9:56:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2018
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232224_3250 W HAMMER_2011-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 • <br /> SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> ❑ Other (Specify) <br /> Test Method Used: ❑ Pressure ❑ vacuum ❑ Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used: 1 Hour Observed Test Equipment Resolution: 1/16 of an inch <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between <br /> applying <br /> pressure/vacuum/water JULa 2 2918 <br /> and starting test: <br /> Test Start Time: ENVIRONMENTAL HEALTH <br /> Initial Reading (R,): PERNlIPSERV! ,_ <br /> Test End Time: <br /> Final Reading (RF): <br /> Test Duration: <br /> Change in Reading (RF- <br /> R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail I ❑ Pass ❑ Fail <br /> Comments — (include information on repairs made prior to testing, and recommended follow-up for failed <br /> tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.