Laserfiche WebLink
4 INDIVIDUAL TANK INFORMATION AND TEST RESULTS ESULTS <br /> 1► nk <br /> TEST DATE:08/20/10 8501 N MOPAC EXPRESSWAY,SUITE 400 WORK ORDER NUMBER2276472 <br /> CLIENT:PETRO-ANALYTICAL AUSTIN,TEXAS 78759(512)451-6334 SITE:KAISER MANTECA <br /> MEMEMEMEMENEEMEM <br /> Tank ID: i Tank manifolded: No Bottom to top fill in inches: 90.0 <br /> Product: DIESEL Vent manifolded: No Bottom to grade in inches: <br /> Capacity in gallons: 10,000 Vapor recovery manifolded: No Fill pipe length in inches: <br /> Diameter in inches: 90.00 Overfill protection: YES Fill pipe diameter in inches: <br /> Length in inches: 1 Overspill protection: YES Stage I vapor recovery: NONE <br /> Material: DW FIBERG Installed: Stage II vapor recovery: NONE <br /> CP installed on: <br /> COMMENTS <br /> RONAN SENSOR IN SUMP AND WET ANNULAR. OWENS CORNING MONITOR, AND PERFERRED UTILITIES MONITOR IN BOILER ROOM. NO <br /> PRINTERS. SNAP TAP IS FOR LINE TEST ONLY, NO LD INSTALLED. <br /> Dipped Water Level: Start(in) End(in) New/passed Failed/replaced New/passed Failed/replaced <br /> Dipped Product Level: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> Probe Water Level: Make: <br /> Ingress Detected: Water Bubble Ullage Model: <br /> Test time: S/N: <br /> Inclinometer reading: Open time in sec: <br /> Holding psi: <br /> VacuTect Test Type: NOT Resiliency c s NOT NOT <br /> VacuTect Probe Entry Point: TESTED TESTED TESTED <br /> Test leak rate ml/m: <br /> Pressure Set Point: Metering psi: <br /> Tank water level in inches: Calib.leak in gph: <br /> Water table depth in inches: Results: <br /> Determined by(method): <br /> Result: <br /> COMMENTS <br /> COMMENTS <br /> Material: STEEL <br /> Diameter(in): <br /> Length (ft): 50.0 <br /> Test psi: 15 <br /> Bleedback cc: 10 <br /> Test time(min): 30 NOT NOT NOT <br /> Start time: 12:36 TESTED TESTED TESTED <br /> End time: 13:06 <br /> Final gph: 0.003 <br /> Result: PASS <br /> Pump type: SUCTION <br /> Pump make: UNKNOWN <br /> COMMENTS Impact Valves Operational: No <br /> LINE PASSED. TESTED FROM BOILER ROOM TO BALL VALVES AT PUMP. <br /> Printed 08/25/2010 08:59 <br />