My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1777
>
2300 - Underground Storage Tank Program
>
PR0232397
>
COMPLIANCE INFO_2005-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 1:36:01 PM
Creation date
6/3/2020 9:56:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2010
RECORD_ID
PR0232397
PE
2361
FACILITY_ID
FA0003978
FACILITY_NAME
KAISER FOUNDATION - MANTECA
STREET_NUMBER
1777
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
20018034
CURRENT_STATUS
01
SITE_LOCATION
1777 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232397_1777 W YOSEMITE_2005-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> SWRCB,January 2002 Page of <br /> ® SPILIUOVERFILL CONTAMIENT BOXES <br /> WFacilityis ui d With S ill/Overfill Containment Boxes ❑ <br /> nta' ent Boxes are Present,but were Not Tested 0eloped By: ❑Spill Bucket Manufacturer 0 Industry Standard n ofessional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ydrostatic <br /> ❑Other(Sped) <br /> Test Equipment Used: t ei-eO 1AA,,, Equipment Resolution: <br /> Spill Box Spill Box# Spill Box# Spill Box ' <br /> Bucket Diameter: I t p% <br /> Bucket Depth: 9 i r` <br /> Wait time between lying <br /> pressure/vacuum/ ater d <br /> starting test: (b Y<a T A Vt-ke S <br /> Test Start Time: a <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(RF): 1 <br /> Test Duration: 36 r-t <br /> ICKPChange in Reading(RF-RI): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: <br /> ass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing and recommended follow up forfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.