My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1777
>
2300 - Underground Storage Tank Program
>
PR0232397
>
COMPLIANCE INFO_2005-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 1:36:01 PM
Creation date
6/3/2020 9:56:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2010
RECORD_ID
PR0232397
PE
2361
FACILITY_ID
FA0003978
FACILITY_NAME
KAISER FOUNDATION - MANTECA
STREET_NUMBER
1777
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
20018034
CURRENT_STATUS
01
SITE_LOCATION
1777 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232397_1777 W YOSEMITE_2005-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 Containment system Pneumatic testing <br /> testing Plan tests carefully and carry them out with all due precaution. <br /> Pressurizing equipment should be suited to the size of the system and the pressure <br /> required and should be operated by qualified and experienced personnel only.Pressure <br /> sources should be capable of approaching test pressure gradually. <br /> Use gauges with a full-scale reading of no more than twice the test pressure:Do not use <br /> a 100 psi gauge for a 10 psi test. Use reliable gauges calibrated against a dead weight <br /> tester and zeroed for atmospheric pressure. <br /> Pneumatic testing at approximately 10 psi is recommended and is the preferred method <br /> of testing containment piping.Higher pressures are dangerous as a sudden release <br /> could cause the piping to whip out of the trench.A 10-psi test will attest to the integrity of <br /> the system.If higher test pressures are mandated,please consult Ameron Fiberglass <br /> Pipe Systems. <br /> Repair procedures Repairing non-contained primary piping <br /> Refer to Ameron Bulletin 7501 for detailed instructions concerning the repair of <br /> primary piping in non-contained systems <br /> Repairing contained primary piping <br /> The 2-inch Dualoy repair coupling is sized so that it can be contained with 4-inch <br /> Dualoy 3000/L pipe.Thus,when repairing primary pipe contained within 3-inch <br /> standard containment pipe,replace the containment pipe with a 4-inch containment <br /> nipple.Join the 4-inch replacement nipple to the existing containment pipe with 4x3 <br /> reducing couplings. <br /> 4 x 3 inch reducing <br /> couplings <br /> 2-inch repair coupling <br /> 0 0 <br /> 0 0 <br /> Fig.i l-1.Refer to Bulletin 7501 for <br /> detailed procedures which must be — — — — <br /> followed for repaired primary piping to <br /> maintain its UL listing. <br /> 0 0 <br /> 0 0 <br /> 4-inch pipe <br /> r___________________ <br /> When repairing lines that have been in service and i <br /> i that may contain flammable fumes,do not use 1 <br /> 1 electric drills or other tools which may constitute a 1 <br /> 1 spark hazard near the pipe.Use only air-driven or <br /> manual tools for cutting and sanding. <br /> L®®®®®®®®®®®®®®®®®®.J <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.