Laserfiche WebLink
A1%L L Fiberglass-Composite Pipe Division <br /> AMERON <br /> INTERNATIONAL DUAL(0`Y@ <br /> 3000 <br /> INSTALLATION PROCEDURES TRAINING <br /> CERTIFICATION OF COMPLETION <br /> Ameron International Fiberglass-Composite Pipe Division <br /> hereby certifies that <br /> John Sutfin <br /> Superior Underound Tank Service <br /> has completed training on the proper installation procedures for <br /> the Dualoy 3000 UL Listed fiberglass piping systems <br /> indicated below as manufactured by the <br /> Fiberglass-Composite Pipe Division of <br /> Ameron International Corporation. <br /> DUALOY 3 000 <br /> -' /L 1 /LCX <br /> California <br /> Location of Training <br /> June 16, 2006 <br /> Date of Training <br /> Bill Robbins <br /> Issued By <br /> Certificate valid for three years from date of issue <br /> 9720 Cypresswood Drive, Houston, TX 77070 <br /> FP669B <br />