Laserfiche WebLink
2098253893 ENGINEERING DEPT. 1167 a.m. 08-27-2009 16 /17 <br />SWRCB, January 2002 page 2 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />X <br />Tank Manufacturer <br />Other (Specify) <br />Industry Standard <br />Professional Engineer <br />Test Method Used:. <br />El <br />Pressure <br />Other (Specify) <br />Vacuum <br />Hydrostatic <br />Tcst Equipment Used: <br />Piping Matcrial-, <br />P ` <br />7-1p 773f, <br />Piping Ran # I DrE <br />fiberglass <br />I <br />Equipment Resolution: <br />Piping Run .1 13xz Piping Run # Piping Ron # <br />fiberglass <br />;9 <br />Piping Manufac turer, <br />arneron <br />ameron <br />Diameter; <br />Piping Diameter; <br />311 <br />311 <br />Length of Piping Run-.' <br />191 <br />19, <br />Product Stored: <br />DIESEL <br />DIESEL <br />Method and location of <br />piping -gun isolation: <br />sump/boot <br />sump/boot <br />Wait d= between applying <br />pressurelvacuutn/watcr and <br />starting test: <br />5min <br />Brain <br />Test Start Time; <br />14:50 <br />14-54 <br />Initial Reading (F4 <br />3psi <br />3psi <br />Test End Time: <br />15-.50 <br />14:55 <br />Final Reading W <br />3psi <br />opsi <br />Test Duration-, <br />-1hr <br />imin <br />Reading <br />Reading (RF - Ik <br />0 <br />3psi <br />"Chamngeiftn <br />Pass/Fail Threshold or <br />or <br />C te a: <br />0 <br />0 <br />Comments - (include information on repairs made prior to testing.. and recommended follow-up for failed tests) <br />