Laserfiche WebLink
PETRO ANALYTICAL- KAISER PERMANENTE -1777 W YOSEMITE AVE, MANTECA, CA 95336 <br />The spill box shall be installed by an OPW trained technician (copy of the Manufacturers <br />Certification is accompanying this submittal). The surrounding concrete is to be saw cut, <br />demolished, and removed. The 4" riser will then be replaced or rethreaded to accommodate the <br />spill box. The riser shall be wrapped with 10 mil tape. New concrete shall be installed with slope <br />away from spill box as required. <br />Type: OPW 1 C-21 00 — DEVR — 5 Gallon, direct bury spill box. <br />A water test of the new sp en <br />L bucket shall be 12rovided for and witnessed by the locLajg <br />The existing 48" square access cover for the piping sump is to be replaced. No excavation shall take <br />place, the existing sump, piping etc shall remain in tact. Ihe surrounding concrete is to be saw cut, <br />demolished, and removed. The new access manway will then be installed over the existing top hat <br />(sump reducer), new rebar reinforcing installed, and new concrete poured to match the existing. <br />Chmme in Monl[I <br />No. The existing System is fully functional and shall <br />be remain unchanged. <br />'U-107111 <br />