Laserfiche WebLink
2098253893 ENGINEERING DEP 0 10 P.m. 09-10-2010 416 <br /> . t <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONIT RING PLAN—(Page 2 of 2) <br /> 77,11 <br /> VY.UNDER DISPENSER CONTAINMENT"(UDC)MONITORING that a hal:ap lval) ! <br /> UDC MONITORING iS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ❑ I.CONTINUOUS ELECTRONIC MONITORING ❑ 2,FLOAT AND CHAIN ASSEMBLY ❑ 3,ELECTRONIC STAND-ALONE 490.54x. <br /> 4,NO DISPENSERS 490.54b. <br /> ® ❑ 99.OTHER(Specify) <br /> LEAK MONITOR MANUFACTURER: ! 490.55. MODEL#: 490-56, <br /> LEAK SENSOR MANUFACTURER: 49U-57. MODEL#(S): 490-58. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AlUDi MILE AND ViSUAL ALARMS. ❑ a.YES ❑ b.NO 40.69, <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b,NO 440 64' <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN, ❑ a,YES ❑ b.NO <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑ a,YES ❑ b.NO 49(662. <br /> _._......._.........._.......--....... ,..,.u...... -,. <br /> UDC CONSTRUCTION IS: ❑ 1,SINGLE WALL ❑ 2.DOUBLE WALL, 49(663• <br /> IF DOUBLE ALL, 490-64a <br /> UDC INTERSTITIAL SPACE IS MQNITORED BY: ❑ a,LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ] a.YES ❑ b.NO 490.64b, <br /> VII. PERIODIC SYSTEM TESTING <br /> El 1.ELD TESTING:THIS FACILITY HAS BEEN NOTIFIeD BY THE STATE WATER RESOURCES CONTROL BOARD THAT 2IHANCED e19065. <br /> LEAK DET t N ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS RE UiRED. 23 CCR E2Wt4.11 <br /> ® 2,SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS, 490-66• <br /> (� 3.SPiLL BU'KETS ARE TESTED ANNUALLY, 490.67• <br /> ` VIII. RECORD KEEPING <br /> The following monitoring/maintcpaticc records are kept for this facility: 490.661 <br /> ® a.ALARM LOGS ®•$,VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ c.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ L ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® It,EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> ® Personnel with UST monitoring responsibilitics arc ffinitiar with all of the following documents relevant to their job duties: <br /> REFERENCE DOCUMENTS MAINTAINED AT FAC'11jTY(Check all that apply) <br /> 0 THIS UNDERGROUND OPESTORAGE UI <br /> RATING MANUALS OR ELECTRONIC MONITORING EQUIPMENT 9 <br /> NT(Required) 49"9x. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.694. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TALK LAW 4"*. <br /> ❑ STATE WATER RESOURCES CONTROL, (BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 49049E <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-69s <br /> ❑ OTHER(Specify): 490.69h. <br /> 4!}0-69i, <br /> This facility has a"Designated UST Opdrutor'who has passed the California UST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The "Designated UST Opantor"will train facility employees in the proper operation and trlitintenance of the UST systems annually,and within 30 <br /> days of hire.This training will inctude,but is not limited to,the following: <br /> I- Operation of the UST systems in a manner consistcnrwith the facility's best management practices, <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Pian. <br /> A The facility employee's role with regard to spills and overfills as specified in tire,facility's UST Response Plan. <br /> ➢ Naine(s)of contact person(s)fol-emergencies and nhonitorhtg alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional cotnntents here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan, 490-71. <br /> XT: PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is rtapomiblc for ensuring that:1.)the daily/routine UST monitoring activities and maintenance of UST leak detection cyuipmcnt coverca <br /> by this plan occurs,2.)all conditions that indicat�ssble release arc investigated_and 3:)all monilorinR mcords are maintained ned E_roperly, � <br /> ............... <br /> THE FOLLOWING PERS (S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: Sam Corbin 490-71 TiTLE:Chief Engineer 490.73, <br /> NAMC: Terrell Estes 490.74- 'TITLE,ASSistanrt Chief Engineer 490-75. <br /> The Designated UST Operator shall perform a tttonthly visual inspection of the futility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-u actim. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I gWfyAat t r provided herein is true and accurate to the best of my knowledge._ <br /> APPLICANT Si6N. DATE: 490-77, <br /> 9/10/20.10 <br /> RURESENMG: 1.Txnk Owner! cruor2.1?mili( Owner/Uerntoi O 3.Authooxrd R t.-twiw ofOwnmf 490.76. <br /> UPCF UST-D(12/2007)-315 www.unidosc.orfi <br /> I <br />