Laserfiche WebLink
F. In -Tank Gauging/ SIR Equipment: ❑ Check this box if tank gauging Is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />r`mmnlata tha fnlinwinn r_hankiiat- <br />v/ Yes <br />No <br />Has all input wiring been Inspected for proper entryand termination, includng testing for ground faults? <br />W Yes <br />❑ No* <br />Were all tank gauging probes visually inspectedfor damage and residue buildup? <br />d Yes <br />No* <br />Was accuracy of system product level readings tested? <br />[J Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />[;6 Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />[ YYes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* in the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD); V Check this box if LLDs are not installed. <br />(1nm Mlata thn fnllnwlnn eharkllct• <br />❑ Yes <br />No* <br />N/A <br />For equipment start-up or annu"quipmenertiflcation, was a leak simulated to verify LLD performance? (Check all <br />that apply) Simulated leak rate: LJ3 g.p.h.; 0.1 g.p.h ; 00.2 g.p.h. <br />Yes <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />No* <br />Was the testing apparatus properly calibrated? <br />Yes <br />No* <br />N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />Yes <br />No* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ Yes <br />�] <br />No* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br />disconnected? <br />Yes <br />o* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br />fails a test? <br />❑ Yes <br />❑ <br />No* <br />N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Yes <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* in the 5ection H, below, asscrioa now ana when these aenciencies were or wni ne correcteo. <br />H. Comments: <br />1 <br />Monitoring System Certification Page 3 of 4 12107 <br />