Laserfiche WebLink
5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer N Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: Test reducer boots,air compressor and gauges Equipment Resolution: 0.5%of span <br /> Diesel-Supply Diesel-Return Diesel-Vent <br /> Piping Material: Plastic Plastic Plastic <br /> Piping Manufacturer: UGM Piping UGM Piping Ameron <br /> Piping Diameter: 1" 1.5" 2" <br /> Length of Piping Run: 40' 40' 20' <br /> Product Stored: D D D <br /> Method and location of <br /> piping-run isolation: Reducer Boots/Fittings Reducer Boots/Fittings Reducer Boots/Fittings <br /> Wait time between applying <br /> pressure/vacuum/waterand 10 Minutes 10 Minutes 10 Minutes <br /> starting test: <br /> Test Start Time: 09:00 AM 09:00 AM 09:00 AM <br /> Initial Reading(RI): 5 5 5 <br /> i <br /> Test End Time: 10:00 AM 10:00 AM 10:00 AM <br /> Final Reading(Rr): 5 5 5 <br /> Test Duration: 60 Min 60 Min 60 Min <br /> Change in Reading(Rr-Rt): 0 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: No Detectable Loss No Detectable Loss No Detectable Loss <br /> Test Result: Pass Pass Pass <br /> Comments—(include information on repairs trade prior to testing, and recontntertded folloii,-up for failed tests) <br /> i <br />