My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1777
>
2300 - Underground Storage Tank Program
>
PR0232397
>
COMPLIANCE INFO_2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 2:06:26 PM
Creation date
6/3/2020 9:56:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017-2018
RECORD_ID
PR0232397
PE
2361
FACILITY_ID
FA0003978
FACILITY_NAME
KAISER FOUNDATION - MANTECA
STREET_NUMBER
1777
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
20018034
CURRENT_STATUS
01
SITE_LOCATION
1777 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\1777\PR0232397\RETROFIT PLAN 2017.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IECEIVED <br />FF -B 0 6 2017 <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />I T L LT <br />Site map enclosed? YES NO [ ] DEPARTMENT <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />a L <br />g���g�� � �g.'°s"��i !�, iC�'^.4.�-► r.'t`�-�j� �+ ,i7-® �swc , �f� i't'7 �� � � � Vii"' <br />Gam=y�dJ�'� t� �`��11 �°-.✓�� �r� �� r�°Z � �'-�e�"�•�,� ✓°�°�.e�.,� —�'�' <br />EN <br />Em <br />1 <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />.�r t rl <br />EH230038 (revised 7-26-2016) 3 <br />Mar <br />
The URL can be used to link to this page
Your browser does not support the video tag.