My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3434
>
2300 - Underground Storage Tank Program
>
PR0232398
>
COMPLIANCE INFO_2004-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 10:56:57 AM
Creation date
6/3/2020 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2015
RECORD_ID
PR0232398
PE
2361
FACILITY_ID
FA0003681
FACILITY_NAME
STOCKTON AUTO CENTER CAR WASH
STREET_NUMBER
3434
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12802011
CURRENT_STATUS
01
SITE_LOCATION
3434 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232398_3434 E HAMMER_2004-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
579
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
illAr" <br />{ <br />UST SYSTEM RETROFIT OR: REPAIR <br />(Submit minimum of 3 sets of plans& applications as originals wIIVbe retained by EHD). <br />1: Site map enclosed? :YES [ J N <br />2. Submit copies of IGC Service;TechnPlan and/or installer,.s.cert[Agbte,:and all manufacturer traI ing,certtficates.:.-oreach. <br />person installing or testing any component that Is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan". is..availableon the Jobsite..as. required by Title 8. <br />3. Detailed description of work'to.be'completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />pdding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />747 <br />4. List of equipment to be used (Attach manufacturers specification sheets showing third -party approval): <br />_.. <br />rcb� 1q.4300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.