Laserfiche WebLink
SWRCB, January 2002 Page of <br />Secondary Containment Testing Report Form <br />This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br />appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br />printouts from tests (f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: Stockton Auto Center Car Wash Date of Testing: January16, 2013 <br />Facility Address: 3434 East Hammer Lane, Stockton, Ca. 95212 <br />Facility Contact: Chris Buscaglia I Phone: (209) 956-4040 <br />Date Local Agency Was Notified of Testing: 1/10/13 by Afford -A -Test <br />Name of Local Agency Inspector (f present during testing): <br />Component <br />Pass Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Component <br />Pass <br />Fail <br />Not Repairs <br />Tested Made <br />Annular Tank #1-87 <br />X ❑ <br />❑ <br />❑ <br />Dispenser Sump #3&4 <br />X <br />❑ <br />❑ ❑ <br />Annular Tank #2&3 -91 -Diesel <br />X ❑ <br />❑ <br />❑ <br />Dispenser Sump #5&6 <br />X <br />❑ <br />❑ ❑ <br />Secondary Pipe #1-87 <br />X ❑ <br />❑ <br />❑ <br />Fill Riser Sump #1-87 <br />X <br />❑ <br />❑ ❑ <br />Secondary Pipe #2-91 <br />X ❑ <br />❑ <br />❑ <br />Fill Riser Sump #2-91 <br />X <br />❑ <br />❑ ❑ <br />Secondary Pipe #3 -Diesel <br />X ❑ <br />❑ <br />❑ <br />Fill Riser Sump #3 -Diesel <br />X <br />❑ <br />❑ ❑ <br />Secondary Pipe #4 -Diesel -Vent <br />X ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ ❑ <br />Secondary Pipe #5 -Gasoline Vapor <br />X ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ ❑ <br />STP Piping Sump # 1-87 <br />X ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ ❑ <br />STP Piping Sump #2-91 <br />X ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ [1 <br />STP Piping Sump #3 -Diesel <br />X ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ ❑ <br />Vent Box Piping Sump <br />X ❑ <br />❑ <br />❑ <br />❑E01❑ <br />El <br />Dispenser Sump # 1 &2 <br />X El <br />El <br />11 <br />El <br />❑ ❑ <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />Test Fluid Supplied and recovered for reuse by, R&D Compliance Testing. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements <br />Technician's Signature:Date: January 16, 2013 <br />