Laserfiche WebLink
Nov 18,09 10:35a <br />209-367-5424 p.2 <br />QIT NG SYSTEM <br />CETIFI TION <br />For Use By All Jurisdictions <br />Within the State of California <br />Authority Cited- Chapter 6.7, Health and Safety Code, Chapter 16, Division 3, Title 23, California Code of Regulations <br />This form must be used to document testing and servicing of monitoring equipment. A se2arate certification or report must be prepared for each <br />monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank system ownertoperator. <br />The ownerioperator must submit a copy of this form to the local agency regulating UST systems within 30 days of test date. <br />A. General Information <br />Facility Name: C vfj� Cr"-c�'— Gl + 0-4-& L2A-tr// Bldg. No.: <br />Site Address: '4164 9 . /..�� ddeA 4-l-2- <br />City: �,cs Com- Zip: 47-g-2=1_ <br />Facility Contact Person: G.dtis 6,! - 2 <br />Contact Phone No.: <br />Make/Model of Monitoring System: 4L c <br />'Z f -Yb Date of Testing./Servicing: <br />B. Inventory of Equipment Tested/Certified <br />Check the a2eapdate boxes to indicatespecific equipment inspected/serviced: <br />Tank ID: 7 <br />Tank ID:� <br />�&In-Tank Gauging Probe. Model: I <br />® In -Tank Gauging Probe. Model: <br />Annular Space or Vault Sensor. Model: 42 <br />[ mnuiar Space or Vault Sensor. Model: <br />Piping Sump ! Trench Sensor(s). Model: ,2 " Q <br />[ Piping Sump / Trench Sensor(s). Model: <br />Fill Sump Sensor(s). Modcl: 2, S� <br />I [R Fill Sump Sensor(s). Model: z(S' <br />Mechanical Lime Leak Detector. Model: tp <br />Mechanical Line Leak Detector. Model: j..,0 <br />❑ Electronic Line Leak Detector. Model: <br />Q Electronic Line Leak Detector. Model: <br />❑ Tank Overfill ! High -Level Sensor. Model: <br />Q Tank Overfill / High -Level Sensor. Model: <br />❑ Other (specify equipment type and model in Section E on Page 2). <br />Q Other (specify equipment type and model in Section E on Page 2). <br />Tank]D: <br />Tank ID: <br />j In -Tank Gauging Probe. Model: ,t# �, _%' <br />Q In -Tank Gauging Probe. Model: <br />[Anular Space or Vault Sensor. Model: G -(,t ��Of <br />Q Annular Space or Vault Sensor. Model: <br />Piping Sump ! Trench Sensor(s). Model: � ' <br />❑ Piping Sump i Trench Sensor(s). Model: <br />Fill Sump Sensor(s). Model: J -Dy <br />❑ Fill Sump Sensor(s). Model: <br />rU Mechanical Lite Leak Detector. Model: _ _ &.19 DO <br />❑ Mechanical Line Leak Detector. Model: <br />Electronic Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. :Model: <br />Tank Overfill! High -Level Sensor. Model: <br />❑ Tank Overfill / High -Level Sensor. Model: <br />Other (specify equipment type and model in Section E on Page 2). <br />❑ Other (specify equipment type and model in Section E on Page 2). <br />Dispenser 1D: <br />Dispenser ID: <br />(*1)ispenser Containment Sensor(s). Model: �,Zj <br />❑ Dispenser Containment Sensor(s). Model: <br />Shear Valvc(s). <br />❑ Shear Valve(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />Dispenser ID: ';/;it <br />Dispenser ID: <br />Dispenser Containment Sensor(s). Model: .x.13 <br />Q Dispenser Containment Sensor{s}. Model: <br />Shear Valve(s). <br />Q Shear Valve(s). <br />Dispenser Containment Float(s) and Chain(s). <br />Q Dispenser Containment Float(s) and Cham(sj <br />Dispenser ID:_ E& <br />Dispenser ID: <br />Dispenser Containment Sensor(s). Model: .2.--Qr - <br />❑ Dispenser Containment Sensor(s). Model: <br />]$ Shear Valve(s). <br />❑ Shear Valve(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />•If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility. <br />C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the <br />manufacturers' guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to verify that this <br />information is correct and a Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such <br />reports, I have also attached a copy of the report; (check all Haat apply):. EIS- m set up ❑Alarm histo report <br />Technician Name (print): S;c�3a � (J',�i�tC= s+ signature - <br />Certification No.: Si! 1119--07- �, Licen N r <br />Testing Company Name: r2Aa,6y �6a Awes /A,)jf Phone No.: (2p () <br />Testing Company Address: �.te:L1=• 41yf t:v.11f _ `A Date of Testing/Servicing: <br />Page 1 of 4 <br />UN -036-114 www.unidocs.org Rev. 01!17/08 <br />