Laserfiche WebLink
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page 4 of <br />Test Method Developed By: <br />iping Manufacturer ❑ Industry Standard <br />❑ ther (Spec) <br />❑ Professional Engineer <br />Test Method Used: <br />ressure ❑ Vacuum <br />❑ ther (Sped) <br />❑ Hydrostatic <br />Test Equipment Used: re-s ; o. e 4 (�) f Equipment Resolution: <br />Piping Run # Piping Run # Piping Run # Piping Run # <br />Piping Material: <br />C �a rr 1, 4�,S s <br />Piping Manufacturer: <br />vv, r4, <br />Piping Diameter: <br />3 `'f X y-' k <br />Length of Piping Run: <br />vv ? Cea Q j <br />Product Stored: <br />V .), yr AWT- <br />Method and location of-}-��.} <br />piping-run isolation: <br />Ct %Su :t �` � <br />Wa' thme between applying <br />pessur acuum/water and <br />st m test: <br />t klau <br />Test Start Time: <br />to �. t <br />Initial Reading (110: <br />15 P i = <br />Test End Time: <br />W. t 5 <br />Final Reading (RF): <br />" P S :7 <br />Test Duration: <br />Inv V, <br />Change in Reading (RF-RO: <br />(A) i, s <br />PassNail Threshold or <br />Criteria• <br />1Q0 lO S S t^ S" <br />Test Result: <br />ass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up <br />for failed tests) <br />