Laserfiche WebLink
-niug: <br />Site Address 3q 1r City: STyG�G7"® zip: <br />f — <br />— <br />Facility Contact Person: Contact Phone No.: ) 9J`�� ' D b <br />Make/Model of Monitoring System: A 1E-0 2-7 _rtS- 3 56 Date of Testing/Servicing: /? / <br />10-6 <br />B. Inventory of Equipment Tested/Certified <br />Check the appropriate boxes to.indicate specific eauinment insner_tedlaerv1-1- <br />Tan1c,JD: Z5 ` O <br />-Er Tank Gauging Probe. Model: <br />nular Space or Vault Sensor. Model: <br />,7!'iping Sump / Trench Sensor(s). Model: <br />5,11 Sump Sensor(s). Model: <br />�"echanical Line Leak Detector. Model: ff Lb Z000 <br />❑ Electronic Line Leak Detector. Model: <br />0 Tank Overfill / High -Level Sensor. Model: <br />❑ Other (specify equipment type and model in Section E on Page 2). <br />Tank ID: <br />Model: f <br />❑ In -Tank Gauging Probe. <br />Model: <br />❑ Annular Space or Vault Sensor. <br />Model: <br />❑ Piping Sump / Trench Sensor(s). <br />Model: <br />❑ Fill Sump Sensor(s). <br />Model: <br />13 Mechanical Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. Model: ' <br />❑ Other (specify equipment type'and <br />model in Section E on <br />Tauk ID: _ `I 1 e> <br />-an <br />T k Ga Probe. <br />e. <br />Model: f <br />Annular Space or Vault Sensor. <br />Model: <br />iping Sump / Trench Sensor(s). <br />Model: <br />43'Fll Sump Sensor(s). <br />.Mechanical Line <br />Model: <br />Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />13 Other (specify equipment type and model in Section E on <br />Tank ID: _ Ih t E -S l- <br />.E]'In-Tank Gauging Probe. <br />❑'ular Space or Vault Sensor. <br />ping Sump / Trench Sensor(s). <br />ll Sump Sensor(s). <br />echanical Line Leak Detector. <br />❑ Electronic Line Leak Detector. <br />❑ Tank Overfill / High -Level Sensor. <br />❑ Other (specify equipment type and r. <br />Model: M Aft <br />Model• <br />Model: <br />Model: <br />Model: e— <br />Model: <br />Model: <br />iodel in Section E on <br />DLDis <br />r ID: - Dispenser ID: <br />V I Containment Sensor(s). Model! ❑ Dispenser Containment Sensor(s). Model: <br />j�Valve(s). ❑ Shear Valve(s). <br />❑ser Containment Float(s) and Chain(s).❑ Di eraser Containment Float(s) and Chain(: <br />Di eraser ID: f `f Dispenser ID: <br />Oispenser Containment Sensor(s). Model: ❑ Dispenser Containment Sensor(s). Model: <br />El Shear Valve(s). ❑ Shear Valve(s). <br />❑ Dispenser Containment Float(s) and Chain(s). ❑ Dispenser Containment Float(s) and Chain(s). <br />D' enser ID: Dispenser ID: <br />Rf.Dtspenser Containment Sensor(s). Model: ❑ Dispenser Containment Sensor(s). Model: <br />21 Shear Valve(s). ❑ Shear Valve(s). <br />1.91)ispenser Containment Float(s) and Chain(s). 1 ❑ Dis enser Containment Floats) and Chain(s). <br />*If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility. <br />C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers' <br />guidelines. Attached to this gertification is information (e.g. manufacturers' checklists) necessary to verify that this information is <br />correct and a Plot Plan showing the layout of m� ' 'onitoring pment: For any a ui went capable of generating such reports, I have also <br />attached a copy of the report; (check all that apply):ystem set-up Alarm history report <br />S <br />Technician Name (print): Z�}„!� All, en ry,7n Signature:.. <br />AUE' <br />Certification No.: License. No.: _�� (! .<j Z jn � 3 C.,(,T <br />CFU L <br />Monitoring System Certification <br />