My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3434
>
2300 - Underground Storage Tank Program
>
PR0232398
>
COMPLIANCE INFO_2004-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 10:56:57 AM
Creation date
6/3/2020 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2015
RECORD_ID
PR0232398
PE
2361
FACILITY_ID
FA0003681
FACILITY_NAME
STOCKTON AUTO CENTER CAR WASH
STREET_NUMBER
3434
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12802011
CURRENT_STATUS
01
SITE_LOCATION
3434 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232398_3434 E HAMMER_2004-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
579
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 14 04 01:33p 209 56,0214 p.2 <br />UNDERGROUND STORAGE <br />TYPE OF ACTION 1. NEW PLAN ❑ 2. CHANGE OF INFORMATION <br />PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />--- :,...,, nowt F1 THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): _ <br />ID # (Agency <br />FACILITYNAME CA11i <br />FACILITY SITE ADDRESS <br />CITY <br />"EII. �EQjIPMENT TESTING AND PVENTVE MAINTENANCE <br />State law requires that testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) be perform, <br />accordance with the equipment manufacturers• instructions, or annually, whichever is more frequent. Such work must be performed by qualified personnel. <br />MONITORING EQUIPMENT IS SERVICED a 1. ANNUALLY ❑ 99. OTHER (Specify): <br />M01. <br />M07 <br />in. MONITOIUNG LOCATIONS <br />This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed (i.e., location of each sensor, <br />line leak detector, monitoring system control panel, etc.). jr you already have a diagram (e.g-, current UST Monitoring Site Plan from a Monitoring System Certification <br />form. Hazardous Materials Business Plan ma , etc.) which shows all required information, include it with this lan. <br />IV. TANK MONITORING <br />MONITORING 1S PERFORMED USING THE FOLLOWING METHOD(S): (Check all that apply) <br />1. CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULTS) Mlt <br />c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />b. LIQUID FILLED ❑ <br />SECONDARY CONi'AINMENT IS: H a. DRi' ❑ Q <br />�{ <br />1412 MODEL #: 3 ra a Ni 13 <br />PANEL MANUFACTURER: :) t Atte ss,s <br />LEAK SENSOR MANUFACTURER: <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANr (S NIP <br />is <br />PANEL MANUFACTURER: M16 MODEL # <br />ntt� <br />IN -TANK PROBE MANUFACTURER: MODEL#(S): <br />\L0 <br />WEEKLY <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. <br />M21. <br />❑ d. MONTHLY ❑ e. OTHER (Specify): <br />M2?. i1: <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): at ; <br />❑ 3. INVENTORY RECONCILIATION ❑ a. MANUAL PER 23 CCR §2646 ❑ b. STATISTICAL PER 23 CCR §2646.1 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />TESTING PERIOD: ❑ a. 36 HOURS F1 b. 60 HOURS <br />❑ 5. INTEGRITY TESTING PER 23 CCR §2643.1 M26. M_' <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): <br />® <br />6.VISUAL MONITORING DONE: ❑ a - DAILY® b. WEEKLY (Rcquiresagencyapr 0 at <br />❑ 99. OTHER (Specify): <br />V. PIPE MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOW ING METHOD(S) (Check all that apply) <br />® 1. CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES) AND OTHER SECONDARY CONTAINMENT ntz <br />SECONDARY CONTAINMENT ISI: �I a. DRY ❑ b. LIQUID FILLED ❑ sct. UNDER PRESSURE [Id. UN'T ISDER VACUUM ,tj <br />PANEL MANUFACTURER: 41EEn +2e'e' 32. MODEL #: <br />.. Mia- MODEL #(S): <br />LEAK SENSOR MANUFACTURER: su,• <br />®a. YES Q b. NO <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN? n� <br />WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ,® a. YES ❑ b. NO <br />PS 2- MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED NO& MODEL#(S). V D Z-Q"n oL <br />MLLD MANUFACTURER(s): _ <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h- LEAK TESTS <br />Mdo. MODEL #: nsa <br />ELLD MANUFACTURER: sss <br />PROGRAMMED LINE INTEGRITY TESTS: ❑ a. MINIMUM MONTHLY 0-2 g.p.h- ❑ b. MINIMUM ANNUAL 0.1 gp h. <br />'%" <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN- ® a. YES ❑ b. NO \PWILL ELLD FAILURFIDISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES [Ib. NO <br />❑ 4. INTEGRITY TESTING Mas M-1 <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) <br />CR S.VISUAL MONITORING DONE: ❑ tt. DAILY 0 b. WEEKi.Y ❑ <br />c. MIN. MONTItt.Y & EACH TIME SYSTEM OPERATED— rt- <br />' Requires aga,ry appnral ^mowed for m0witorin6 of „n&uied enKrgenry generator tial piping only per l I$C �2$281.5(bY <br />❑ 6. PIPING 1S SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR §2636(a)(3) <br />❑ 7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) `s - <br />[1 99. OTHER (Specify) <br />07/Z3l03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.