Laserfiche WebLink
May 14 04 01:38p <br />?Monitoring System Certification <br />Site Address: <br />n0 <br />209.956.0214 <br />UST Monitorin Site Plan <br />p.13 <br />. . . . . . . . . . . . _ . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . <br />4" <br />' . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . _ . . . . _ _ . . . . _ . . <br />et`.... .`, - p•--.._.................. <br />... .... ./. ............ ................ <br />...... ..... .. ..... ...._. <br />.............------- .----- - -: - -- • - - - - <br />Date map was drawn:'�4 /,ie/ / o <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br />Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br />locations of the following equipmcnt, if installed: monitoring system control panels; sensors monitoring tank annular <br />>paces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br />:ietectors; and in -tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan <br />:vas prepared. <br />Page 4 of 4 05/00 <br />