Laserfiche WebLink
01/22/2004 <br />09:27 209-473- <br />RISHWAIN & RIS N <br />PAGE 04/08 <br />Jan 21 <br />04 05:10p <br />20:&8.0214 <br />Wpm <br />P.5 <br />SWRCB, January 2002 <br />'Itk Metbod Developed By: <br />Ten Method Used: <br />Ten Equipment Used: -'g:;,'A- <br />Piptag Material: <br />Pf*& Manukouver <br />pipw Diameter: <br />Loo of Piping Rim: <br />Product Sort& <br />Method and location of <br />b&g:m isolation, <br />Wait time between applying <br />pressure/vacutwVwater and <br />starting tftv <br />Test Start Time: <br />Initial Reading (P4): <br />Test End Time: <br />Final Reading (RF): <br />Test DuraTion- --- <br />Change in Reading (RrRj): <br />PaSS/Fail Threshold or <br />Page <br />S. SXCONDAILY P= TIESTING <br />2f'ipft 0 Industry Standard 0 Professional 3:fIgintmr--­- <br />00 Apeefy) <br />gbor <br />"ressurc 0 Vacuum <br />71 Hydrostatic <br />13 Other vc;fy) <br />"Iz9!.IGW6 Equipment Resolution: <br />g Ron N PIP4P= # Piping Run Piping Run k <br />ftp coil0 Pass <br />1 0 Fail <br />ior,to test and recommended follow -y or 'ailed —,. <br />, <br />VI r <br />- IL CL <br />