My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3434
>
2300 - Underground Storage Tank Program
>
PR0232398
>
COMPLIANCE INFO_2004-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 10:56:57 AM
Creation date
6/3/2020 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2015
RECORD_ID
PR0232398
PE
2361
FACILITY_ID
FA0003681
FACILITY_NAME
STOCKTON AUTO CENTER CAR WASH
STREET_NUMBER
3434
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12802011
CURRENT_STATUS
01
SITE_LOCATION
3434 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232398_3434 E HAMMER_2004-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
579
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"S''M1 99 LD -2000 New Series <br />Highest Performance, <br />Most Requested <br />• - -•Mechanical - Leak Detector Built • • . <br />yN <br />• Any Fuel* <br />• Any Pump* <br />• Any Pipeline System* <br />• Longest Length Pipeline System* <br />• Largest Volume Pipeline System* <br />• Integrated Check Valve / <br />Pressure relief <br />*see technical specification <br />- "• t ti 1' <br />The 99 LD -2000 is now the most requested mechanical line leak detector built today. New <br />engineering and the VMI 2 -year warranty (after installation) make the 99 LD -2000 more <br />attractive to station operators today than ever before. Not only is the 99 LD -2000 less ex- <br />pensive to own, it is faster and less subject to field and line variables than ever before! <br />Integrated In -Line Check Valve / Pressure Relief <br />Leaking check valves in the turbine, defective submersible pump pressure relief, or a defec- <br />tive bypass valve will allow the line system to depressurize, resetting the leak detector. <br />Drain -back into the pump or thermal contraction will cause vapor pockets to form. Vapor <br />pockets increase the length of time it takes for a leak detector to open to full flow. Pump <br />problems such as these result in slow flow and technical support calls. The resulting service <br />costs and customer dissatisfaction all take away from the bottom line - making money. <br />The • 000 The Only Leak Detector <br />Capable Of Holding Line Pressure After the Pump Is Off— <br />Pump Component WearOr - <br />**Patent application in process <br />
The URL can be used to link to this page
Your browser does not support the video tag.